NOU jjS:02 FR flMBASSflDOR CONSJR. C0212 949 9762 TO 6694107 P.03/36
AMBASSADOR CONSTRUCTION CO., INC
Mr.Walter Weems
November 13, 1998
Page Two...
6) Additional switching room 2330, included new and
relocated wiring.
Electrical Cost $ 640.00
7) Per drawing E4-02 dated 9/25/98; (DELETED)
A. Add one (1) 200amp 3 pole and one (1) 70amp 3 pole breaker in EDPL-23E.
B. Delete one (1) 3 pole lOOamp breaker in EDPL-23E.
C. Revise panel ULP-23W and ULP-R from 3 phase 4 wire to 1 phase three wire.
D. Add one (1) 50amp 2 pole breaker in panel ELP-23C1.
E. Delete two (2) 15amp 1 pole breakers in panel ELP-23C1.
All panels have been delivered and installed with the branch circuitry and feeders. Panel
EDPL23-E will have to be replaced in its entirety. All branch and feeder wiring will be
removed and then re-installed. Panel ULP23W & R will also have to be replaced. New panels
will be provided and re-installed. New breakers will be installed for panel ELP-23C-1.
This above work has been changed by Cosentini’s sketches FSK-2, 3, 4, 7 and 9 as per the
following wiring changes and fusing changes:
- Re-route eight (8) 1-pole circuits from ELP 23C to ELP 23C1
and add one (1) 3-pole 100A CB to ELP 23C
- EDPL-23E - Add one (1) 3-poIe 70A CB
- ELP - 23W- Delete three (3) one pole 15 A CB’s and one (1)
3-pole 70 A CB
- Change wiring for UPS’s from 2#1, 2 #2 and 1 #250 MCM to 3 #4,
1 #2/0 and 2 #4.
- ELP R - Delete three (3) 1-pole 15 A CB’s
- ELP R - Add one (1) 3-pole 50A and one (1) 3-pole 70A
- Downsize fusing in feeder disconnect from 150A to 70A.
-As per FSK-8 add one (1) speaker/strobe
Electrical Cost __ $3.^.QQJD.O
Subtotal Electrical Cost $17,065.00
Additional Cut and Patch __ XSaO-OD
Subtotal $18,565.00
General Conditions ’b 1,485.00
Overhead and Fee 1,203.00
Insurance । / ____ 2_6.OG
Total 21,519.00
Forward...
NOU-17-1998 15=58 212 949 9762 98X P.03
NYC-WTC_000171898
OCR can misread numbers and units. Confirm readings against the page image before using them.