AMBASSADOR CONSTRUCTION CO., INC.
October 21, 1998
Mr. Walter Weems
Silverstein Properties, Inc.
7 World Trade Center
New York, NY 10048
]
RE; Mayor's Office of Emergency Management
7 World Trade Cente.'- -1, 7 & 23rd Floors
Change Order #020
Amb.Jo.b_#.S57^.175
Dear Mr. Weems:
We are pleased to submit herewith our change order #020 to perform the following work at the
above reference premises for the sum of TWELVE THOUSAND EIGHT HUNDRED SIXTY
SIX DOLLARS ($12,866.00):
SCOPE OF WORK
In response to RFI#33, provide power for fan power boxes at 277volts from new circuits.
Work includes removing wiring already in place back to the source. The circuitry to be
removed is PM-23-M1 #’s 37, 39. 41, and 38 and PP-23-M2 #14, 16 and 46. Wire fans to
existing circuits #EHP-23C #'s 4, 3 and 11 and EHP-23B #7 and 4 and a new circuit from
panel #EHP-23C #16. All work must be performed through existing finish ceilings.
Electrical $8,600.00
Ceiling. Cut & Patch 2,500.00
General Conditions 888.00 ✓
Overhead & Fee 719.00 /
Insurance
Total ooo
Please approve this change order so we may proceed.
Very truly yours,
/A^ASS/dOR C^s/rUCTION co., INC.
Martin Schneider
Vice President
MS:ag
cc; Juan Mejia - SHO
Glenn Pymento - DCAS
Accepted:, Dated:
212 922 1020, FAX 212 949 9762