NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166918
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

2) Voltage Regulator. a 3) Motorized Voltage Adjust Potentiometer.

4) . Cross Current Compensation Transformer.

5) Isolation Transformers.

8. Outgoing feeder cubicles shall each contain 3 pole, 600 volt stored energy type, electrically operated air circuit breaker with adjustable long, short time and instantaneous and ground fault (alarm only) overcurrent trips, sized as indicated on the drawings. Each breaker shall be provided with a control switch and pilot lights. Each feeder cubicle shall incorporate ground fault sensors and alarm relay with (2) N.O. and (2) N.C. contacts. Include visual and audible indication of alarm. Alarms shall be displayed on front face of switchgear. Each breaker shall contain current limiting fuses for 200,000 A.I.C. rating and fuses shall be sized to provide downstream protection (series rated) for equipment such as automatic transfer switches, etc.

9. All generator circuit breakers shall have adequate interrupting capacity for the maximum short circuit that they will be required to interrupt. The maximum short circuit shall be calculated in during the motor contribution.

C. Generator power and control switchgear shall be manufactured by Russelectric, Automatic Switch Company. Any alternate shall be submitted to the consulting engineer in writing 10 days prior to bid. Each alternate bid must list any deviations from this specification.

D. Factory Test

1. The generator power and control switchgear shall be tested at the factory to demonstrate compliance with the Specifications. Tests shall be witnessed by the Owner and/or his representative. A certified copy of the performance test shall be submitted before shipment to the job site. Any defects which become evident during the test shall be corrected before continuing.

E. Site Tests

1. Manufacturer shall provide the services of factory trained engineer and the technicians to conduct and supervise site tests.

OEM PPS-43 Generators 7 WTC March 20, 1998

NYC-WTC_000166918

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166918Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →