Engineering firm correspondence, 7 World Trade Center, August 1999

Machine-extracted title · confidence 70%

Correspondence from engineering firm regarding 7 World Trade Center Mayor's Office of Emergency Management project.

NYC-WTC_000172389–000172391

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000172390
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1)3 04 99 OS II l-'U 2122I902.36 .SWV.NKE HAYDEN CONM-I.I. 1^00.3 004 OS/03/89 16:02 F'AJL 212 815 3700 COSENTI.NI I21003z'004

Mr. Joe Aliotta Swaruce Hayden Connell Page Two CoMTiHni AuociolM LLP Coruuiltng Engineer]

3, A simulated power outage was performed on automatic transfer switches (A.T.S.) numbers 2 thru 9. During loss of normal power all “AT, S.’s” tranEferred to the altemate power source with no difficulties. Time set points were set on all swtehes.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power AT S.# 1 started the generators and was on line in approximately 7 seconds. Al other switches transferred to alternate power source.

5. : A total power outage was performed by opening all transfer switches alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds) and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. i Russel Electric to modify their software to perform priority load shedding sequence.

Remark; At this point of the system it does not affect the operation to deliver emergency power, but must be incorporated and testtsd.

2. I Coirect the fbeJ oil pump system not operating for this test.

RMoark: The system is connected to a building fuel pump for temporary use. Operation of system is not affected. I 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark; R.B. Samuds to complete

4. ' Correct on all 3 generator’s cracks in muffler insulation.

Remark: Ambassador to address.

I

Combi Chicago New York CDriondo Wruhlnglon, CXZ

NYC-WTC_000172390

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172390Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →