Generator load test report for Mayor's Office, August 1999

Machine-extracted title · confidence 93%

Memo detailing a generator load test conducted on August 31, 1999, identifying minor problems with pressure controllers and ATS switches at the Mayor's Office of Emergency…

NYC-WTC_000174096–000174098

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000174096
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OS 04 99 0S:l0 EA.t 2122190256 SHANKE HAYDEN CONNELL 1^002/004 08/03/99 16:01 FAX 212 815 3700 COSE^INI 0002/004

Ic-lephOT'? Fnx h-TSmc-l AjdiC.V. Two Pennsyvv'O Hkixu New Ycik. NY 10121 212.6.5 .1600 212.615.;P00 nitp //w\~w,tc.senhni com

o ft / z' zr z

ASSOCIATES LLP Cosenlini Auociotes LLP Consulting Engineers August 2, 1999 PonncTS M. A Mass, PE □. Moxuf PH R P. tebcG PE Mr. Joe Aliotta J.C. Mo.-.s, PL J. MicHuei, PE Swatike Hayden Connell •S.A. QluiI. PF 295 Lafayette Street M. YV. Moybcei'!, Pr New York, NY 10012 E. BofNeri, PC Re; ' Mayor’s Office of Emergency Management I. BiensiyA, Pt ‘ (Generator Test) S. Lebei. PF J O-skwerek, PE Our Job No. 1854 M. A. 5ch'.nf,s, PE

Dear Mr. Aliotta;

The following are the nsults of the Emergency Generator test for the noted project on 7/31/99.

List of Attendees: I I Juan Mejia Swanke Hayden Connell Mazen Babirsem Ambassador Tom Papsonero DCAS Richard Jarde R.6. Samuels Tony Coyle R.B. Samuels Manny Georgioudavis R,B. Samuels Brian Reynolds Russd Electric Frank) Trim arco H.O. Penn Glen Neville APT Charles Magee SPT

I. The generator fiill load test started approximately 6;00A.M., engines 1. 2, and 3 ran at full load for 2'/2 hours. During this run. H.O. Penn monitored and recorded all vital characteristics on the generators (endesEttpleM^nd-freopy-ef H.O. Penn’s test report). •re-fet- tfe 2. The transict vollage load step test was performed for each of the 3 generators for each of , and total system. During the test "APT’ with recording instrumenution recorded each step. The record charts will be examined by Cosentini for proper voltage deviation. i

Combridgb ChiWigc NewYofi Ofinndo Wo'hingfc<>. CC

NYC-WTC_000174096

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174096Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →