NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854
Document / 3 pages

Engineering memorandum, job 1854, August 1999

Machine-extracted title · confidence 95%

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

NYC-WTC_000172539–000172541

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000172539
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OS 04 00 OS 10 l-u 21221002,56 .SWVNKK HAYDEN CONNEI.I. !4S<)O2 004 08/03/99 18:01 FAX 212 815 3700 COSENTINI ®002/004

Two Pannsvi-.-■'0 Pkj’C Fiix j‘’srnc-i FdJieA.5 New Ycik. NY 10121 212 6,5 .1 *00 212..l!l.').:P00 iKp /ceseniini com

ASSOCIATES LLP Cosenlini Auociotes LLP Comuhing Enginasn August 2, 1999 PonncTS M. A Mom, PE 0. .Moxur PF R P. tebci. PE Mr, Joe Aliotta J.C. iWs, Ft Swanke Hayden Connell J. MicHaaF. PF •S.A. Ql.'.iiI. Pr 295 Lafayette Street M. W. AAoybcuin. PF New York, NY 10012 E. BofHftri, PC Re: ' Mayor’s Office of Emergency Management I. Biensiod. PE ‘ (Generator Test) .< tcbei, PF J OskwQrek, PE Our Job No. 1854 M. A. Schio.s.'i, PE

Dear Mr. Aliotta:

The following are the results of the Emergency Generator test for the noted project on 7/31/99.

List of Attendees: I ) Juan Mejia Swanke Hayden Connell Mazen Batarsem Ambassador Tom Papsonero DCAS Richard Jarde R.B. Samuels Tony Coyle R.B. Samuels Manny Georgioudavis R.B. Samuels Brian Reynolds Kussei Electric Frankl T rim arco H.O. Penn Glen Neville APT Charles Magee SPT

I. The generator foil load test started approximately 6:00AM., engines 1, 2, and 3 ran at foil load for 216 hours. During this run H.O. Penn monitored and recorded all vita] characteristics on the generators (ewdomtplaaap i^d^oopy of H.O. Penn’s test report).

2. The tranaiet voltage load step test was performed for each of the 3 generators for each of I and total system. During the test “APT* with recording instnunenution recorded each step. The record charts will be examined by Cosentini for proper volcage deviation. i I

CombndgM Cl'iu’ifjo NawYori OHnndo WoAhingkX'. OCZ

NYC-WTC_000172539

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172539Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →