Engineering memorandum, job 1854, August 1999

Machine-extracted title · confidence 95%

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

NYC-WTC_000172539–000172541

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854”

Page image
Scanned page image, NYC-WTC_000172539
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

OS 04 00 OS 10 l-u 21221002,56 .SWVNKK HAYDEN CONNEI.I. !4S<)O2 004 08/03/99 18:01 FAX 212 815 3700 COSENTINI ®002/004

Two Pannsvi-.-■'0 Pkj’C Fiix j‘’srnc-i FdJieA.5 New Ycik. NY 10121 212 6,5 .1 *00 212..l!l.').:P00 iKp /ceseniini com

ASSOCIATES LLP Cosenlini Auociotes LLP Comuhing Enginasn August 2, 1999 PonncTS M. A Mom, PE 0. .Moxur PF R P. tebci. PE Mr, Joe Aliotta J.C. iWs, Ft Swanke Hayden Connell J. MicHaaF. PF •S.A. Ql.'.iiI. Pr 295 Lafayette Street M. W. AAoybcuin. PF New York, NY 10012 E. BofHftri, PC Re: ' Mayor’s Office of Emergency Management I. Biensiod. PE ‘ (Generator Test) .< tcbei, PF J OskwQrek, PE Our Job No. 1854 M. A. Schio.s.'i, PE

Dear Mr. Aliotta:

The following are the results of the Emergency Generator test for the noted project on 7/31/99.

List of Attendees: I ) Juan Mejia Swanke Hayden Connell Mazen Batarsem Ambassador Tom Papsonero DCAS Richard Jarde R.B. Samuels Tony Coyle R.B. Samuels Manny Georgioudavis R.B. Samuels Brian Reynolds Kussei Electric Frankl T rim arco H.O. Penn Glen Neville APT Charles Magee SPT

I. The generator foil load test started approximately 6:00AM., engines 1, 2, and 3 ran at foil load for 216 hours. During this run H.O. Penn monitored and recorded all vita] characteristics on the generators (ewdomtplaaap i^d^oopy of H.O. Penn’s test report).

2. The tranaiet voltage load step test was performed for each of the 3 generators for each of I and total system. During the test “APT* with recording instnunenution recorded each step. The record charts will be examined by Cosentini for proper volcage deviation. i I

CombndgM Cl'iu’ifjo NawYori OHnndo WoAhingkX'. OCZ

NYC-WTC_000172539

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172539Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →