PonncTS
M. A Mom, PE
0. .Moxur PF
R P. tebci. PE
Mr, Joe Aliotta J.C. iWs, Ft
Swanke Hayden Connell J. MicHaaF. PF
•S.A. Ql.'.iiI. Pr
295 Lafayette Street
M. W. AAoybcuin. PF
New York, NY 10012
E. BofHftri, PC
Re: ' Mayor’s Office of Emergency Management I. Biensiod. PE
‘ (Generator Test) .< tcbei, PF
J OskwQrek, PE
Our Job No. 1854
M. A. Schio.s.'i, PE
Dear Mr. Aliotta:
The following are the results of the Emergency Generator test for the noted project on 7/31/99.
List of Attendees:
I
)
Juan Mejia Swanke Hayden Connell
Mazen Batarsem Ambassador
Tom Papsonero DCAS
Richard Jarde R.B. Samuels
Tony Coyle R.B. Samuels
Manny Georgioudavis R.B. Samuels
Brian Reynolds Kussei Electric
Frankl T rim arco H.O. Penn
Glen Neville APT
Charles Magee SPT
I. The generator foil load test started approximately 6:00AM., engines 1, 2, and 3 ran at foil
load for 216 hours. During this run H.O. Penn monitored and recorded all vita]
characteristics on the generators (ewdomtplaaap i^d^oopy of H.O. Penn’s test report).
2. The tranaiet voltage load step test was performed for each of the 3 generators for each of
I and total system. During the test “APT* with recording instnunenution recorded each
step. The record charts will be examined by Cosentini for proper volcage deviation.