Engineering memorandum, job 1854, August 1999

Machine-extracted title · confidence 95%

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

NYC-WTC_000172539–000172541

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000172540
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

O.S 04 90 OS I I EKt 21 j;:i00?.36 •SWKNKE HKVDEN CONNEI.I. 1^00,3/00 4 08/03/99 18:02 FAX 212 61S 3700 COSEEUXL, 21003/004

Mr. Joe Alictta SwaoKe Hayden Connell Page Two CoMntini AuocialM LLP Coruulltng Engineers

3, A simulated power outage was performed on automatic transfer swiitchcs (A.T.S.) numbers 2 thru 9, During loss of normal power all “A.T,S .’s” transferred to the alternate power source with no difficulties. Time set points were set on ail switches.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power AT S.#I started the generators and was on line in approximately 7 seconds. All other switches transferred to alternate power source.

5. ; A total power outage was performed by opening all transfer switchers alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds) and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. ' Russel Electric to modify tiieir software to perform priority load shedding sequence.

' Remark: At this point of the system it does not affect the operation to deliver emffl-gency power, but must be incorporated and tcstisd.

2. I Correct the £bel oil pump system not operating for this test.

Remark: The system is connected to a building feel pump for temporary use. Operation of system is not affected. 1 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark: R.B. Samuels to complete

4. * Correct on all 3 generator’s cracks in muffler insulation.

Remark; Ambassador to address.

I

Combi irjg«i Chicogo Now York C^riondo WdihJnglon, DC

NYC-WTC_000172540

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172540Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →