Engineering memorandum, job 1854, August 1999

Machine-extracted title · confidence 95%

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

NYC-WTC_000172539–000172541

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854”

Page image
Scanned page image, NYC-WTC_000172540
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

O.S 04 90 OS I I EKt 21 j;:i00?.36 •SWKNKE HKVDEN CONNEI.I. 1^00,3/00 4 08/03/99 18:02 FAX 212 61S 3700 COSEEUXL, 21003/004

Mr. Joe Alictta SwaoKe Hayden Connell Page Two CoMntini AuocialM LLP Coruulltng Engineers

3, A simulated power outage was performed on automatic transfer swiitchcs (A.T.S.) numbers 2 thru 9, During loss of normal power all “A.T,S .’s” transferred to the alternate power source with no difficulties. Time set points were set on ail switches.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power AT S.#I started the generators and was on line in approximately 7 seconds. All other switches transferred to alternate power source.

5. ; A total power outage was performed by opening all transfer switchers alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds) and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. ' Russel Electric to modify tiieir software to perform priority load shedding sequence.

' Remark: At this point of the system it does not affect the operation to deliver emffl-gency power, but must be incorporated and tcstisd.

2. I Correct the £bel oil pump system not operating for this test.

Remark: The system is connected to a building feel pump for temporary use. Operation of system is not affected. 1 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark: R.B. Samuels to complete

4. * Correct on all 3 generator’s cracks in muffler insulation.

Remark; Ambassador to address.

I

Combi irjg«i Chicogo Now York C^riondo WdihJnglon, DC

NYC-WTC_000172540

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172540Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →