NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854
Document / 3 pages

Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000172543–000172545
Page image
Scanned page image, NYC-WTC_000172544
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

os 04 99 OS II EU 2I22I9O2.5« •SWKMKE HAYDEN CONNEl.l. 1^00,3/004 08/03/99 IS; 02 F'AI 212 SIS 3700 121003/004

Mr. Joe Aliotta SwaoKe Hayden Connell Page Two CoMTtlni Aisocialw IIP CoruulHng Engineers

3. A simulated power outage was performed on automatic transfer switches (A.T.S.) numbers 2 thru 9. During loss of normal power all “AT.S.’s” transferred to the alternate power source with no difficulties. Time set points were set on all siwitches.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power A.T S.#l started the generators and was on line in approximately 7 seconds. All other switches transferred to alternate power source.

5. A total power outage was performed by opening all transfer switches alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds') and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. i Russel Electric to modify their software to perform priority load shedding sequence.

‘ Remark; At this point of the system it does not affect the operation to deliver emergency power, but must be incorporated and tested.

2. I Coirect the fuel oil pump system not operating for this test.

Remark; The system is connected to a building feel pump for temporary use. Operation of system is not affected. I 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark: R.B. Samuels to complete

4. ' Correct on all 3 generator’s cracks in muffler insulation.

Remark; Ambassador to address.

1

Combi idQfl Chicogo Now York Orlando Wfishlnglon, OC

NYC-WTC_000172544

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172544Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →