Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000172543–000172545
Page image
Scanned page image, NYC-WTC_000172544
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

os 04 99 OS II EU 2I22I9O2.5« •SWKMKE HAYDEN CONNEl.l. 1^00,3/004 08/03/99 IS; 02 F'AI 212 SIS 3700 121003/004

Mr. Joe Aliotta SwaoKe Hayden Connell Page Two CoMTtlni Aisocialw IIP CoruulHng Engineers

3. A simulated power outage was performed on automatic transfer switches (A.T.S.) numbers 2 thru 9. During loss of normal power all “AT.S.’s” transferred to the alternate power source with no difficulties. Time set points were set on all siwitches.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power A.T S.#l started the generators and was on line in approximately 7 seconds. All other switches transferred to alternate power source.

5. A total power outage was performed by opening all transfer switches alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds') and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. i Russel Electric to modify their software to perform priority load shedding sequence.

‘ Remark; At this point of the system it does not affect the operation to deliver emergency power, but must be incorporated and tested.

2. I Coirect the fuel oil pump system not operating for this test.

Remark; The system is connected to a building feel pump for temporary use. Operation of system is not affected. I 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark: R.B. Samuels to complete

4. ' Correct on all 3 generator’s cracks in muffler insulation.

Remark; Ambassador to address.

1

Combi idQfl Chicogo Now York Orlando Wfishlnglon, OC

NYC-WTC_000172544

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172544Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.994

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →