August 2, 1999
Ponncrs
M. A Moss, PE
0. McxjC PF
R P. Icboi. PE
Mr. Joe Aliotta J.C. PL
Swanke Hayden Connell J. PF
•S.A. Qtail. PF
295 Lafayette Street M. W. AAoybcui'i. PF
New York, NY 10012
E. Bofberi, PC
Re: ' Mayor’s Office of Emergency Management I. Biensiock, Pt
(Generator Test) ?!. Lebei. PF
J Oskwarek, PE
Our Job No. 1854
M. A. Schloss, PE
Dear Mr. Aliotta;
The following are the results of the Emergency Generator test for the noted project on 7/31/99.
List of Attendees:
I
I
Juan Mejia Swanke Hayden Connell
Mazen Batarsem Ambassador
Tom Papsonero DCAS
Richard Jarde R.B. Samuels
Tony Coyle R.B. Samueb
Manny Georgioudavis R.B. Samuels
Brian Reynolds Russel Electric
Frankl Trim arco H O. Penn
Glen Neville APT
Charles Magee SPT
I. The generator foil load test started approximately 6:00A.M., engines 1. 2, and 3 ran at foil
load for 214 hours. During this run U.O. Penn monitored and recorded all vital
characteristics on the generators (eMfosB±pteMe!find4-ee^-of H.O. Penn’s test report).
Y-e-Pcr tb
2. The transiet voltage load step test was performed for each of the 3 g<merators for each of
, and total system. During the test “APT* with recording instnunenution recorded each
step. The record charts will be examined by Cosentini for proper voltage deviation.