August 2, 1999
Ponncrs
M, A Mass, PE
D. Mozur. Pi-
R P. Icbot, PE
Mr. Joe Aliotta O.C. Mass, PL
Swanke Hayden Connell J. Micimwli, PP
•S.A. Quoil. PF
295 Lafayette Street M. W. Maybauin. PF
New York, NY 10012
E. BorNc-ri, PC
Re; I Mayor’s Office of Emergency Management I. Bieiisioi-i, PE
* (Generator Test) R. tebei. PF
Our Job No. 1854 J Oskworek, PE
M. A. Schloss, PE
Dear Mr. Aliotta;
The following are the ranilts of the Emergency Generator test for the noted project on 7/31/99.
List of Attendees:
Juan Mejia Swanke Hayden Connell
Mazen Batarsem Ambassador
Torn ^apsonero DCAS
Richard Jarde R-B. Samuels
Tony Coyle R B. Samuels
Mann^ Georgioudavis R.B Samuels
Brian Reynolds Russd Electric
Frank) Trim arco H.O. Penn
Glen Seville APT
Charles Magee SPT
I. The generator full load test started approximately 6;00A.M., engines 1.2, and 3 ran at foil
load for 214 hours. During this run H O. Penn monitored and recorded sill vita]
characteristics on the generators (enclosed please find a copy of H.O. Penn’s test report).
2. The transict voltage load step test was performed for each of the 3 generators for each of
) and total system. During the test “APT’ with recording instrumentation recorded each
step. The record charts will be examined by Cosentini for proper voltage deviation.
I
i
!