3. A simulated power outage was performed on automatic transfer switches (A.T.S.)
, numbers 2 thru 9, During loss of normal power all “AT.S’s” transferred to the Alternate
' power source with no difficulties. Time set points were set on all switches.
4. A simulated power outage was performed on A.T.S. #1. During loss of normal power
A.T S.#l started the generators and was on line in approximately 7 seconds. All other
switches transferred to alternate power source.
5. ; A total power outage was performed by opening all transfer switches alternate power
disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other
transfer switches remained at primary power source position until generators were on line
(approximately 7 seconds) and served each of the transfer switch loads.
The fotiowing items were noted to be addressed and completed:
1. j Russel Electric to modify their software to perform priority load shedding sequence.
‘ Remark: At tins point of the system it does not affect the operation to deliver
emergency power, but must be incorporated and tested.
2. J Collect the fuel oil pump system not operating for this test.
; Remark; The system is connected to a building fuel pump for temporary use.
Operation of system is not affected.
1
3. ‘ Electrical contractor to label all buss duct and local disconnect switches.
. Remark: R.B . Samuels to complete
4. Correct on all 3 generator's cracks in muffler insulation.
Remark; iKmbassador to address.
1
1
Combiidge Chicago New York CDrlando Wfishinglon, DC
NYC-WTC_000171253
OCR can misread numbers and units. Confirm readings against the page image before using them.