NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management®(Generator Test)®Our Job No. 1854
Document / 3 pages

Field observation report fax cover, 7 WTC OEM, Aug 1999

Machine-extracted title · confidence 95%

Fax cover sheet dated August 4, 1999, transmitting a field observation report regarding the Mayor's Office of Emergency Management at 7 World Trade Center.

NYC-WTC_000171252–000171254

Folder label: “Mayor's Office of Emergency Management®(Generator Test)®Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000171253
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

J^/04/99 08:11 FAX 2122190256 SWANKE HAYDEN CONNELL @003/004 08/03/89 16:02 FAX 212 615 3700 COSEJSmiL. @003/004

Mr. Joe Aliotta Swanke Hayden Connell Page Two Cosentini Associalw LLP CoruuiHng Engineers

3. A simulated power outage was performed on automatic transfer switches (A.T.S.) , numbers 2 thru 9, During loss of normal power all “AT.S’s” transferred to the Alternate ' power source with no difficulties. Time set points were set on all switches.

4. A simulated power outage was performed on A.T.S. #1. During loss of normal power A.T S.#l started the generators and was on line in approximately 7 seconds. All other switches transferred to alternate power source.

5. ; A total power outage was performed by opening all transfer switches alternate power disconnect switches. Loss of normal power to A.T.S. #1 started the generators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds) and served each of the transfer switch loads.

The fotiowing items were noted to be addressed and completed:

1. j Russel Electric to modify their software to perform priority load shedding sequence.

‘ Remark: At tins point of the system it does not affect the operation to deliver emergency power, but must be incorporated and tested.

2. J Collect the fuel oil pump system not operating for this test.

; Remark; The system is connected to a building fuel pump for temporary use. Operation of system is not affected. 1 3. ‘ Electrical contractor to label all buss duct and local disconnect switches.

. Remark: R.B . Samuels to complete

4. Correct on all 3 generator's cracks in muffler insulation.

Remark; iKmbassador to address.

1

1

Combiidge Chicago New York CDrlando Wfishinglon, DC

NYC-WTC_000171253

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000171253Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.988

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →