Generator load test report for Mayor's Office, August 1999

Machine-extracted title · confidence 93%

Memo detailing a generator load test conducted on August 31, 1999, identifying minor problems with pressure controllers and ATS switches at the Mayor's Office of Emergency…

NYC-WTC_000174096–000174098

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854”

Page image
Scanned page image, NYC-WTC_000174097
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

.03/04 99 03:11 EA.\ 21221902,56 SW.-VNKE H.AYDEN CONNELL 1^00.3/004 08/03/99 16:02 FAX 212 ei-S 3700 ^SEEtlhL,. 121003/004

Mr. Joe Aliotta Swanxe Hayden Connell Page Two CoMfiSni AuociaiM LLP Coruullfng Engineers

3, A simulated power outage was performed on automatic transfer switches (A.T.S.) numbers 2 thru 9, During loss of normal power all “A,T.S’s” transfenred to the alternate ■ power source with no difficulties. Time set points were set on all switches.

4. A simulated pov/er outage was performed on A.T.S. #1. During loss of normal power A.T S.#l started the generators and was on line in approximately 7 seconds. All other switches transfe.Ted to alternate power source.

5. ; A total power outage was performed by opening all transfer switches alternate power discormect switches. Loss of normal power to A.T.S. #1 started the gtmerators. All other transfer switches remained at primary power source position until generators were on line (approximately 7 seconds') and served each of the transfer switch loads.

The following items were noted to be addressed and completed:

1. i Russel Electric to modify their software to perfonu priority load shedding sequence.

‘ Remark: At this point of the system it does not affect the operation to deliver emergency power, but must be incorporated and tested.

2. I Coirect the fuel oil pump system not operating for this test.

Remark; The system is connected to a building fuel pump for temporary use. Operation of system is not affected. I 3. Electrical contractor to label all buss duct and local disconnect switches.

Remark; R.B. Samuels to complete

4. i Correct on all 3 generator's cracks in muffler insulation.

Remark; /ambassador to address.

Combi idg« CSicogo Nbw York Wiuh(ngto»i. DC

NYC-WTC_000174097

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000174097Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.989

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →