Mr. Joe Aliotta
Swanke Hayden Connell
PageTh^
Countinl Auoclates LLP
Conwking Enginaan
5. Install emergency break glass stop button per contract drawing.
Remark: R.B. Samuels to install.
6. Con ect load bank on generator #2. Remove jumper and install new components.
Remark; Ambassador to address.
7. Investigate why on initial generator start-up generator #3 stopped running due to air in the
fuel line.
Remark Was this an isolated or re-occurring problem? H.O. Penn to investigate.
Conclusion ; The emergency generator system was left in the autojnatic position and is
ready to deliver emergency power at demand. The items noted above
should be addressed as soon as possible for proper design operation.
If mo*® information is required, Iplease contact me at (212) 615-2665.
Very truly yours,
OQsiimNI ASSOCIATES
Robert LeDonne
cc; Juan Mejia Swanke Hayden Connell
Vai Lemeshev CA
Michael Maybaum CA
Ed Martinez CA
I
X:\Wp\^U.RSM KJ4SWILAR0I103.L01
I
Canibodgo Chicago NawYofk Oilfjndo Woshiiifiion, OC
NYC-WTC_000172545
OCR can misread numbers and units. Confirm readings against the page image before using them.