Mr. Joe Aliotta
Swanke Hayden Connell
Page Three
Couniini AMOCiotes LLP
ConsulHng Engi nears
5, Install emergency break glass stop button per contract drawing.
Remark; R.B. Samuels to install.
6. Con ect load bank on generator Remove jumper and install new components.
Remark; Ambassac^or to address.
1. Investigate why on initial generator start-up generator #3 stopped running due to air in the
fuel line.
Remark; Was this an isolated or re-occuning problem? H.O, Penn to investigate.
Conclusion. The emergency generator system was left in the automatic position and is
ready to deliver emergency power at demand. The items noted above
should be addressed as soon as possible for proper design operation.
If mo*® information is required, please contact me at (212) 615-2665.
Very truly yours,
OeSfiNTINI ASSOCl^ES
Robert LeDonne
cc; Juan Mqia Swanke Hayden Connell
‘ Vai Lemeshev CA
Michael Maybaum CA
Ed Martinez CA
X\wrYn-FaU K54.»\RLARnR03.U) 1