NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166923
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

b. An inphase monitor shall be provided for closed transition operation. The moritor shall control transfer/retransfer between live sources so that closure on the alternate source will occur only when the two sources are within 5 electrical degrees maximum, 5 % maximum voltage difference, and 0.2Hz.

c. Closed transition transfer shall be accomplished with no power interruption and without altering the or actively controlling standby generator set.

5. The automatic transfer/bypass isolation switches and accessories shall conform to the requirements of:

a. UL 1008 - Standard for Automatic Transfer Switches

b. NFPA 70 - National Electrical Code

c. NFPA 99 - Essential Electrical Systems for Health Care Facilities

d. NFPA 110 - Emergency and Standby Power Systems

e. IEEE Standard 446 - IEEE Recommended Practice for Emergency and Standby Power Systems for Commercial and Industrial Applications.

f. NEMA Standard ICS2-447 - AC Automatic Transfer Switches

g- IS09001

G. Transfer switches shall be as manufactured by Automatic Switch Company or Russ- electric. Any alternate shall be submitted to the consulting engineer in writing 10 days prior to bid. Each alternate bid must list any deviations from this specification.

2,10 GRAPHIC ANNUNCIATOR

A. Provide illuminated graphic mimic panel to show a system one-line including generators, generator switchgear, ATS’s, normal feeders and building secondary service switchboards. Provide led indicator for breaker status (open/closed), load shed, ATS position, generator shutdown and ATS (bypass position), utility, etc. Dry contacts shall be provided at the building switchgear and other locations.

B. Submittal shall include detail information as to size, construction, etc.

(1854.98\elec.pps)

OEM PPS-48 Generators 7 WTC March 20, 1998

NYC-WTC_000166923

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166923Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →