NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166922
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

The control panel shall be completely enclosed with a protective cover and mounted separately from the transfer switch unit for safety and ease of maintenance. Sensing and control logic shall be provided on plug-in printed circuit boards. Interfacing relays shall be industrial grade plug-in type with dust covers. The control panel shall meet or exceed the requirements for Electromagnetic Compatibility (EMC) as follows:

a. Electrostatic Discharge (ESD) - lEC 801-2 '

b. Electrical Fast Transients (EFT) -lEC 801-4 and NEMA ICS-1-109

c. Surge Withstand - (lEC 801-5 and IEEE 472 (ANSI C37.90A)

d. Electromagnetic Interference - Mil Std 461, Class 3

F. Provide for each automatic transfer switch noted with BPIS provide a fully-rated bypass­ isolation switch (BPIS) manufactured by the automatic transfer switch (ATS) manufacturer. Each (BPIS) shall be adjacent to its associated (ATS), complete with bus connections as required. Submit price difference, if any, for side by side or front to back ATS & BPIS. Each (BPIS) shall incorporate the following features and functions:-

1. It shall be possible to bypass and isolate (for maintenance and/or testing) the ATS without interrupting power to the load served by the ATS.

2. It shall be possible to transfer the load to either the normal or the emergency source when in the "bypass mode".

3. It may be integrally mounted in a common enclosure with the ATS, or field mounted in a separate NEMA I enclosure.

4. Each UPS ATS/bypass shall be of the closed transition transfer type as follows:

a. Shall transfer the load without interruption (closed transition) by momentarily connecting both sources of power only when both sources are present and acceptable. The maximum interconnection time is 100 milliseconds. The switch shall operate as a conventional break-before- make (open transition) switch when the power source serving the load fails. Designs that transfer in a delayed transition manner (intentional delay in the neutral position) when closed transition transfer is bypassed are not acceptable.

OEM PPS-47 Generators 7 WTC March 20, 1998

NYC-WTC_000166922

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166922Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →