NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854
Document / 3 pages

Engineering firm correspondence, 7 World Trade Center, August 1999

Machine-extracted title · confidence 70%

Correspondence from engineering firm regarding 7 World Trade Center Mayor's Office of Emergency Management project.

NYC-WTC_000172389–000172391

Folder label: “Mayor's Office of Emergency Management (Generator Test) Our Job No. 1854

Page image
Scanned page image, NYC-WTC_000172389
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

1)3 ')4 49 03 10 F'V.t 2122190258 SWLNKK HAYDEN CONM-I.I. 1^00 2 00 4 08/03/99 18:01 FA.t 212 815 3700 COSENTINI 0002/004

Two Pannsy.-..-.0 Hk.izc Ifi-teplu J'1'3 Fox ■ I'lfifnc-i Adtiiev, New YcA.'nY 10121 212 6.5 .1600 2i2..5l.5.:P00 Ilir; // w\~w '.o,s43niini com

zr zr 7 ASSOCIATES LLP Cosenlini Associates LLP Consulting Enginoan August 2, 1999 PonncTi M. A Masi, PE 0. Mo'uf PF R P. loboi, PE Mr. Joe Aliotta J.C. W.s, PL Swanke Hayden Connell J. Michuwli, PF •S.A. Quuil, Pp 295 Lafayette Street M. W. Maybuuin. PF New York, NY 10012 E. BofNc'ri, PC Re; ' Mayor’s Office of Emergency Management I. Bieosiocl. PE (Generator Tert) a. Lebel. PF J Oskworek. PE Our Job No. 1854 M. A. 5chlo5.i, PE

Dear Mr. Aliotta:

The following are the results of the Emergency Generator test for the noted project on 7/31/99.

List of Attendees* I i Juan Mejia Swanke Hayden Connell Mazen Batarsem Ambassador Tom Papsonero DCAS Richard Jarde R.B. Samuels Tony Coyle R.B. Samuels Manny Georgioudavis R.B. Samuels Brian Reynolds Kussd Electric FrankjTrimarco H.O. Penn Glen Neville APT Charles Magee SPT

1. The generator lull load test started approximately 6;00AM., engines 1. 2, and 3 ran at lull load for 2Mi hours. During this run U.O. Penn monitored and recorded all vital characteristics on the generators (oi»cisBB±pitt»e4ind-a-6Gpy-0f H.O Penn’s test report). , Y'e-Pcr 2. The transiet voltage load step test was performed for each of the 3 gtrnerators for each of , and total system. During the test “APT" with recording instrumenution recorded each step. The record charts will be examined by Cosentini for proper voltage deviation. i

Combi idgM Cliiu')(‘)C NawYort OHordo Wo'hinglon.

NYC-WTC_000172389

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000172389Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Engineering memorandum, job 1854, August 1999 · Box 7DCAS

NYC-WTC_000172539

Engineering consultant memorandum dated August 2, 1999 related to 7 World Trade Center Mayor's Office of Emergency Management.

3 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.992

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →