NYC 9/11 Public Portal Document
PPS-Generators
2) Check - In this position, the synchronizer is fully operational
J except it cannot close the generator breaker. The phase-lock
feature holds the generator output in synchronism with the bus.
3) . Off - In this position, the synchronizer is turned off to allow for
manual paralleling at the Master Cubicle.
4) Run - In this position, the fiilly operational automatic mode.
e. Failure to Synchronize Reset Switch
1) A momentary pushbutton switch shall be provided to reset the
"fail to synchronize" alarm.
f. Current Transformers
Current transformers shall be furnished with V > A > burden ratings
suitable to supply the metering, protective devices and electronic
governor without affecting their accuracy. Ratios shall be selected to
cause ammeter scale deflection to the top 25 % of scale at the full load
rating of the engine generator when computed at 0.8 pf.
1) All current transformers shall have shorting type terminal blocks.
g- Potential Transformers
Potential transformers shall be provided in turns ratio and VA burden
rating to be compatible with the controls, metering and the electronic
governor. Transformers shall have primary and secondary fuses.
h. Engine Governor, Generator Voltage Regulator and Miscellaneous
Engine Generator Set Controls
Engine Generator Set Controls
The switchgear manufacturer, shall mount and wire all electronic and
electric controls associated with the engine generator set governor and/or
voltage regulator as described in the engine generator set specifications.
These controls shall be furnished by the engine generator set distributor to
the switchgear manufacturer for mounting and wiring. The controls will
include, but not be limited to the following:
1) Electronic control portion of governor.
OEM PPS-42 Generators
7 WTC March 20, 1998
NYC-WTC_000166917
OCR can misread numbers and units. Confirm readings against the page image before using them.