PPS-Generators
2. Supplier shall inspect the unit after installation. Any deficiency with the
installation s^all be brought to the attention of the contractor for repair or
alteration. The unit shall be started up and run to determine that all systems are
functional.
F. Operation and Maintenance Manuals
1. The bidder shall furnish six copies of operating and maintenance instructions and
illustrated parts books covering the generator power and control switchgear and
auxiliary equipment which will require operating instructions and periodic
maintenance.
G. Commissioning
1. Furnish the services of a competent, factory-trained engineer or technician to be
available at the job site for period of two days for initial start-up and for
instruction personnel in operation and maintenance of the equipment, on the dates
requested by the Owner.
H. Provide short circuit and coordination study for emergency power system from generators
downtoATS's.
2.09 AUTOMATIC TRANSFER SWITCHES
A. Automatic transfer switches shall, for the indicated amperage and voluge, conform to the
performance requirements specified below. The switches shall be for operating charac
teristics as indicated and shall be complete with all integrally mounted and wired up
components as required to automatically transfer a load back and forth between a normal
and an emergency source under the conditions specified below.
B. Submit manufacturers certification attesting to the fact that, at the specified voltage, the
main contacts of each transfer switch;-
1. Are capable of carrying the specified amperes continuously without damage when
mounted in the specified enclosure and with such enclosure located in a space
having an ambient temperature of 110°F.
2. Are for at least 50 operations and without damage of any sort, including pitting,
able to interrupt a low power factor (40% or less) current equal to 6 times the
continuous requirement.
3. Are, without damage of any sort, able to handle a closing current surge equal to