NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166907
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

The switchboard station battery shall be identical to the engine starting batteries as described herein. <

3) Control power distributed ftom within the system logic control umt shall require a discrete circuit isolated through a protective circuit breaker. Control power distribution circuit shall be defined, but not limited to a minimum of (30 circuits, each with its associated circuit breaker:

Generator and Total system PLC DC bus - DC to DC converter, etc.

Non PLC, System Logic Bus.

ATS/Customer Interface DC Bus for customer external connections (engine start signals, etc.)

d. Bus Underftequency Protection

The generator bus shall have a solid-state frequency monitor (Device 8IB) with integral time delay to initiateioad shedding upon a reduction of bus ftequency to 58 Hz or less for a period of two seconds or more. Upon sensing a bus underftequency, the system shall automatically shed the lowest priority load connected at the time of occurrence. This shed circuit shall override any manual load-add operation and shall lock out the manual load-add circuitry. It shall give visual and audible alarm annunciation of bus underftequency load shed.

e. Load Shed Bypass-Reset Pushbutton

Provide a pushbutton, load shed bypass-rest control switch. The switch shall provide for supervised operation over the load-shed, load-add circuits, controls shall be provided so that in the event a bus overload occurs resulting in a reduction in bus frequency, the lowest priority load will be shed automatically by an override circuit. One switch shall be provided for each priority block except first priority.

f. Main Bus Underfrequency Reset Pushbutton

Provide a bus underftequency reset pushbutton to rest bus underftequency load shed signal.

OEM PPS-32 Generators 7 WTC March 20, 1998

NYC-WTC_000166907

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166907Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →