NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166908
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

g- System Test Switch a Provide a system no-load test switch to initiate a complete automatic system operation by simulating the closure of the remote engine start signal. This switch shall be mounted inside the master section to limit access to authorized personnel only.

h. Master Audible Alarm

Provide a master audible alarm. The alarm horn shall be the DC vibration type, adjustable from 78 to 102db. Include an alarm silencing pushbutton and circuitry to allow subsequent malfunctions to resound the alarm if the horn had been previously silenced following an initial malfunction.

i. Load Demand Control

Load demand control logic shall be provided to sense the load connected to the bus and establish the proper number of sets to operate to maintain the connected load with the minimum on-line reserve generating capacity of 10% of the rating of a single set. The load demand control logic shall initiate the disconnection of a generator from the bus whenever the on­ line reserve generating capacity exceeds 120% of a single generator.

The load demand control logic shall have adjustable set points for initiating the addition to, and removal from, the bus of the generator sets. The load demand control logic shall be designed to maximize field economy while maintaining sufficient capacity to service the load.

Upon sensing that the on-line reserve capacity has increased to 120% or more, a 180 second time delay (adjustable 0-300 seconds) shall be initiated. If the reserve capacity stays above 120% for the duration of the time delay, the circuit breaker of the last set that went on line shall be opened. The engine shall run for its cooldown period, then shutdown.

j- Bus Load Optimization

If a generator fails while operating in the emergency mode, it is disconnected form the bus and shutdown. The lowest priority loads are shed. Audible and visual alarms will be activated to indicate the condition.

OEM PPS-33 Generators 7 WTC March 20, 1998

NYC-WTC_000166908

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166908Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →