Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166909
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

After a stabilization period, (user adjustable, 0-03 minutes), the shed load^ shall be automatically readied to the emergency is in discrete load increments until the until the bus has been loaded to 95% of it capacity.

k. The plant operator can manually override the predetermined loading sequence by turning the bus load optimizer selector switch to the "off" position. Individual "off-auto-on" selectors are provided for each discrete load. By operating these switches, the plant operator may remove and/or add individual loads as required. A light shall indicate when a load has been signaled to connect to the bus. A sums light will light when bus has been loaded to 95 % capacity and shall be labeled "Bus Loaded to Capacity." Should the plant operator inadvertently overload the bus between 110% and 115% the bus capacity, the unsupported load block (a block of load for which no generator is connected to the bus) shall be reshed.

If at any time the bus is overloaded greater than 115 % of the bus capacity or the bus frequency drops to 58 Hz or less for more than two seconds, then all bus optimizing loads as well as the lowest priority supported load block connected to the bus are shed. A status light annunciating a "Bus Overload" shall be activated examined by the plant operator. After taking appropriate actions, the condition may be reset via the "Bus Overload Reset" pushbutton.

I. Load Priority Selection

Each load shall be assigned a block shedding priority. The total user assigned load for each priority block shall not exceed the capacity of one engine generator set.

Each discrete load shall have a user assigned load re-add step #(1,2,3... .30). If a block of lad has been shed, the individual loads will be added back onto the bus in ascending order of the load step re-add# until the engine generator sets have reached 95 % of capacity.

Each discrete load shall also have a user entered maximum load DW value assigned to it. This value shall be used to determine if particular load can be re-added to the bus without exceeding the available bus capacity.

OEM PPS-34 Generators 7 WTC March 20, 1998

NYC-WTC_000166909

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166909Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →