After a stabilization period, (user adjustable, 0-03 minutes), the shed
load^ shall be automatically readied to the emergency is in discrete load
increments until the until the bus has been loaded to 95% of it capacity.
k. The plant operator can manually override the predetermined loading
sequence by turning the bus load optimizer selector switch to the "off"
position. Individual "off-auto-on" selectors are provided for each discrete
load. By operating these switches, the plant operator may remove and/or
add individual loads as required. A light shall indicate when a load has
been signaled to connect to the bus. A sums light will light when bus has
been loaded to 95 % capacity and shall be labeled "Bus Loaded to
Capacity." Should the plant operator inadvertently overload the bus
between 110% and 115% the bus capacity, the unsupported load block (a
block of load for which no generator is connected to the bus) shall be
reshed.
If at any time the bus is overloaded greater than 115 % of the bus capacity
or the bus frequency drops to 58 Hz or less for more than two seconds,
then all bus optimizing loads as well as the lowest priority supported load
block connected to the bus are shed. A status light annunciating a "Bus
Overload" shall be activated examined by the plant operator. After taking
appropriate actions, the condition may be reset via the "Bus Overload
Reset" pushbutton.
I. Load Priority Selection
Each load shall be assigned a block shedding priority. The total user
assigned load for each priority block shall not exceed the capacity of one
engine generator set.
Each discrete load shall have a user assigned load re-add step
#(1,2,3... .30). If a block of lad has been shed, the individual loads will
be added back onto the bus in ascending order of the load step re-add#
until the engine generator sets have reached 95 % of capacity.
Each discrete load shall also have a user entered maximum load DW
value assigned to it. This value shall be used to determine if particular
load can be re-added to the bus without exceeding the available bus
capacity.
OEM PPS-34 Generators
7 WTC March 20, 1998
NYC-WTC_000166909