Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166885
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

» 1. In response to a "cranking” signal from the generator control switchgear, all engine generator sets shall be automatically started, synchronized and paralleled, and shall pick up and divide all "first priority" loads in stages within 10 seconds. All second priority loads shall be picked up in stages within 15 seconds.

2. Load handling capability to be such as to permit the specified load to be carried for 350 consecutive hours without trouble or damage.

3. Each generator shall be designed to carry its load with a lull load temperature rise, as measured by resistance, of not more than 80° over a 40°C ambient temperature. Limitations on the maximum allowable sub-transient reactance as specified herein may result in a full load temperature rise less than 80°C. The generator shall have a sub-transient reactance of less than 12% (at its specified full load rating) as derived by re-rating the reactance down from the sub-transient reactance based on the generator 130°C KW rating.

4. Speed governor operation such that at any fixed operating temperature variation from any manually selected speed shall be zero for any steady state load from no load up to specified load conditions.

5. Voltage regulation to be such as to permit a setting of the manual voltage adjustment device hereinafter specified which will maintain the output voltage within a range of plus or minus 1/2% of nominal for any steady state load from on load up to the specified load conditions.

6. Stable operation to be such that for any particular steady state load (between no load and the specified load conditions) the steady state frequency deviation shall not exceed ±1/4%.

7. Stable operation to be such that for any particular steady state load (between no load and the specified load conditions) the steady stale voltage deviation shall not exceed ±%%.

8. Surge handling capability to be such as to permit a one step application of a load whose "KW" is 100% of the specified generator set rating, without casing the engine to stall.

9, Voltage transient deviation shall be 20 percent maximum from rated generator terminal voltage on one step application or removal of full load when generator is driven by diesel engine.

OEM PPS-IO Generators 7 WTC March 20, 1998

NYC-WTC_000166885

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166885Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →