NYC-WTC_000166787
Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗1993-03-19 – 2008-11-16
machine-extracted · confidence unavailable · Check page ↗Machine extraction can misread a scan. Check the source page. Stored confidence scores are extractor outputs, not a guarantee of accuracy; regex matches currently carry 1.00.
| Month | Pages |
|---|---|
| Mar 1993 | 1 |
| Aug 1993 | 1 |
| Sep 1993 | 1 |
| Jul 1997 | 6 |
| Aug 1997 | 1 |
| Sep 1997 | 1 |
| Oct 1997 | 10 |
| Nov 1997 | 3 |
| Dec 1997 | 1 |
| Jan 1998 | 8 |
| Feb 1998 | 3 |
| Mar 1998 | 6 |
| Apr 1998 | 2 |
| May 1998 | 3 |
| Jun 1998 | 5 |
| Jul 1998 | 4 |
| Aug 1998 | 3 |
| Sep 1998 | 12 |
| Oct 1998 | 16 |
| Nov 1998 | 17 |
| Dec 1998 | 16 |
| Jan 1999 | 20 |
| Feb 1999 | 15 |
| Mar 1999 | 6 |
| Apr 1999 | 15 |
| May 1999 | 5 |
| Jun 1999 | 5 |
| Jul 1999 | 3 |
| Aug 1999 | 6 |
| Sep 1999 | 2 |
| Oct 1999 | 1 |
| Nov 1999 | 2 |
| Dec 1999 | 3 |
| Jan 2000 | 3 |
| Feb 2000 | 1 |
| Mar 2000 | 2 |
| Jun 2008 | 1 |
| Oct 2008 | 1 |
| Nov 2008 | 1 |
NYC-WTC_000167423 · page 2machine-extracted · confidence unavailable · Check page ↗
Value engineering memo, 7 World Trade Center, September 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Equipment deletion distribution memo, value engineering package, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Acknowledgment of requisition for OEM drawings review, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural and engineering design services proposal, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence unavailable · Check page ↗
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural and engineering design services proposal, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Sept 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional services authorization form, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Acknowledgment of requisition for OEM drawings review, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization for UPS design, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization #5576CH, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization form for OEM audio-visual work, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
OEM space allocation scheme comparison, Nov 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Unreadable document excerpt · page 1machine-extracted · confidence unavailable · Check page ↗
OEM 7 World Trade Center Floor Diagram Revision · page 1machine-extracted · confidence unavailable · Check page ↗
Structural engineering fee proposal for OEM, Dec 17, 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167217 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167224 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167225 · page 1machine-extracted · confidence unavailable · Check page ↗
Meeting agenda for OEM design development, Jan 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Meeting agenda for OEM design development, Jan 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural plan transmission for OEM 23rd floor, Jan 31, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Site access form, 7 World Trade Center, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-5, January 12, 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter re: basis of noise level calculations, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax transmittal: OEM project documents, Feb 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional services authorization: OEM security revisions, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Specifications for OEM equipment at 7 WTC, undated · page 1machine-extracted · confidence unavailable · Check page ↗
Fax transmittal for OEM design documents, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter re: OEM emergency generator usage definition, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter re: noise levels for generator room, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter re: basis of noise level calculations, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Specification approval memo, 7 WTC, March 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Project coordination memo, MOEM 7 World Trade Center, April 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Project status memo, MOEM 7 World Trade Center, April 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Document record NYC-WTC_000166786, Citywide Administrative Services · page 2machine-extracted · confidence unavailable · Check page ↗
Furniture Manifests for OEM Space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Project coordination memo, MOEM 7 World Trade Center, April 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet for project correspondence, June 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Transmittal letter for OEM furniture manifest at 7 WTC, Jun · page 1machine-extracted · confidence unavailable · Check page ↗
Letter Transmittal of Final Furniture Manifest for MOEM, June 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Pricing and cuts for non-contract OEM furniture, June 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000171247 · page 1machine-extracted · confidence unavailable · Check page ↗
Audiovisual and acoustics consulting invoice, MOEM, Aug 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo transmittal of Bulletin #1 drawings and specs, July 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Credit change order #014 submission for Mayor's OEM at 7 · page 1machine-extracted · confidence unavailable · Check page ↗
Drawing request form for OEM work at 7 World Trade, · page 1machine-extracted · confidence unavailable · Check page ↗
Additional architectural and mechanical design services, MOEM, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Upgraded protective wall design services invoice, MOEM, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services fee invoice, 7 WTC corridors, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Specifications for OEM equipment at 7 WTC, undated · page 1machine-extracted · confidence unavailable · Check page ↗
Telecommunications consultant invoice for crisis center, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional architectural and mechanical design services, MOEM, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, MOEM project, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Upgraded protective wall design services invoice, MOEM, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services fee invoice, 7 WTC corridors, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo requesting document distribution for OEM project, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo requesting drawing revisions for main entrance doors, Sep 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Equipment Deletion Memo, 7 World Trade Center, Sept 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization for OEM project, 7 World Trade Center, · page 2machine-extracted · confidence unavailable · Check page ↗
Value engineering memo, 7 World Trade Center, September 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Equipment deletion distribution memo, value engineering package, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Telecommunications consultant invoice for crisis center, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for Mayor's Office Emergency Management design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for rooftop microwave dishes design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for lobby security revisions design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence unavailable · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence unavailable · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural and mechanical design invoice, Mayor's Office of Emergency Management, · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expense invoice, Mayor's Office of Emergency Management, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural design invoice, MOEM protective wall, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Design services invoice, 7 WTC corridor project, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 7 WTC public corridors, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo requesting document distribution for OEM project, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Correspondence regarding OEM Order #016, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
FAX: Refrigerator and coffee machine clarification, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Technical data sheet for equipment specifications, 2003 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional services authorization form, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Design revision invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for Mayor's Office Emergency Management design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for rooftop microwave dishes design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Invoice for lobby security revisions design, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax: Concerns regarding painting A/V enclosures, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo: Painting metal panels, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax transmittal: OEM project documents, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo: Transformer and panel installation locations, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo: FSK clarifications and louver shop drawings, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization #5576CH, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Unidentified form excerpt from DCAS, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172254 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet regarding MOEM project at 7 WTC, Oct · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-1, November 17, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-2, November 24, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167493 · page 1machine-extracted · confidence unavailable · Check page ↗
Design revision invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural inspection invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Loading dock revision design labor, 140 Broadway, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
7th floor corridor design services, 7 WTC, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Telecommunications consultant invoice for crisis center, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo: Schlage exit feature request, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo: Door and hardware schedules, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional services authorization: OEM security revisions, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo: Drainage and slab replacement drawings, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Engineering sketches for beam penetrations, 7 WTC, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Consultant meeting minutes #18, Nov 24 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172269 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172990 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-3, December 24, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-4, December 28, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167473 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, Mayor's Office emergency management, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, emergency management additional services, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural controlled inspection invoice, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167493 · page 1machine-extracted · confidence unavailable · Check page ↗
Design revision invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural inspection invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Loading dock revision design labor, 140 Broadway, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
7th floor corridor design services, 7 WTC, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet with press room layouts, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo regarding FSK-56A and 56D specifications at 7 WTC, Jan · page 1machine-extracted · confidence unavailable · Check page ↗
Schedule of computer deliveries, Dec 4 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax covering requested memos from meeting, Jan 5, 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo on generator louver cladding, OEM 7 WTC, Jan 5, · page 1machine-extracted · confidence unavailable · Check page ↗
Site access form, 7 World Trade Center, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Site access form, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Fax covering FSK-56A and FSK-56D attachments, Jan 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-5, January 12, 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, protective wall design, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, security design, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 7 WTC corridors, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, Mayor's Office additional design services, March 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural controlled inspection invoice, March 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, Mayor's Office emergency management, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, emergency management additional services, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural controlled inspection invoice, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 7 WTC corridor, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, MOEM, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, MOEM, Feb 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Drawing request form for OEM work at 7 World Trade, · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167423 · page 2machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization for UPS design, 7 WTC, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional Services Authorization form for OEM audio-visual work, Mar 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Transmittal of revised structural engineering comments, 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
Transmittal of revised structural engineering comments, 7 World Trade Center, · page 2machine-extracted · confidence unavailable · Check page ↗
Drawing request form for OEM work at 7 World Trade, · page 1machine-extracted · confidence unavailable · Check page ↗
Shipping charges invoice, April 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Shipping charges invoice, April 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167417 · page 2machine-extracted · confidence unavailable · Check page ↗
Fee invoice, 7 World Trade Center corridor submissions, May 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, April 26, 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, controlled inspections, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, blueprint costs, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, blueprint costs, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 7 WTC corridors, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, 7 WTC corridors, Apr 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Fuel line framing plan transmittal, May 10 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Ground transportation services invoice, May 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Professional services invoice, 140 Broadway revisions, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee invoice, 7 World Trade Center corridor submissions, May 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, May 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Fuel line framing plan transmittal, May 10 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Additional services authorization form, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Blueprint and delivery invoice, 140 Broadway, Jul 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, Mayor's Office of Emergency Management, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Professional services invoice, 140 Broadway revisions, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo regarding 7 WTC route drawing, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
Blueprint and delivery invoice, 140 Broadway, Jul 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
System checkout report for OEM at 7 World Trade Center, · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, 7 World Trade Center, August 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Field observation report fax cover, 7 WTC OEM, Aug 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Technology consultants system checkout report, July 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172976 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172977 · page 1machine-extracted · confidence unavailable · Check page ↗
MOEM reimbursable expenses invoice, September 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural reimbursable expenses invoice, June-August 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167364 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167364 · page 1machine-extracted · confidence unavailable · Check page ↗
Mayor's Office Emergency Management reimbursable expenses, Dec 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Transportation service invoice, 7 World Trade Center, January 2000 · page 1machine-extracted · confidence unavailable · Check page ↗
Architect reimbursable expenses invoice, February 2000 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence unavailable · Check page ↗
Architect reimbursable expenses invoice, February 2000 · page 1machine-extracted · confidence unavailable · Check page ↗
Product specification sheet for fuel oil room access hatch, March · page 1machine-extracted · confidence unavailable · Check page ↗
Architect memorandum regarding fuel oil room inspection request, March 2000 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet for project correspondence, June 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
FAX: Refrigerator and coffee machine clarification, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Ceiling inspection memo, 7 World Trade Center OEM, Nov 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Document record NYC-WTC_000166786, Citywide Administrative Services · page 1machine-extracted · confidence unavailable · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural services invoice, controlled inspections, Apr 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural controlled inspection invoice, March 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Reimbursable expenses invoice, MOEM, March 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000167473 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural controlled inspection invoice, Feb 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural inspection invoice, Jan 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Architectural design invoice, MOEM protective wall, Oct 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Fax regarding door release approval rejection, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter on hurricane wall design approval, June 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Memo authorizing reconstruction contract commencement, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Letter re: basis of noise level calculations, Mar 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax transmittal re: OEM equipment memo, Feb 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
DCAS response to DD architectural drawings, Feb 20, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
A/V program confirmation memo, 7 WTC, Jan 31, 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Architectural design services proposal, 7 WTC, October 1997 · page 1machine-extracted · confidence unavailable · Check page ↗
Fax memo: Roof shed construction site visit, Dec 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Distribution list, 7 World Trade Center 23rd floor SHCA drawing, · page 1machine-extracted · confidence unavailable · Check page ↗
Distribution list, 7 World Trade Center 23rd floor SHCA drawing, · page 2machine-extracted · confidence unavailable · Check page ↗
Engineering consultation Exhibit A, 7 World Trade Center · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for OEM World Trade Center project · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate addendum for HVAC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's Office of Emergency Management, May · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate addendum, World Trade Center, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC space design cost estimate addendum, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC cement and concrete cost estimate addendum, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC sprinkler system cost estimate addendum, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC unspecified trade cost estimate addendum, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC electric fixtures cost estimate addendum, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction Cost Estimate for MOEM Space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's Office at WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for iron and steel work at WTC, · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for sprinkler work at WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction Cost Estimate Form, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction Cost Estimate Form, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate form, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, Mayor's Office of Emergency Management, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, ceiling trade, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, electric fixtures, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
HVAC construction cost estimate, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Plumbing construction cost estimate, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Painting cost estimate, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Flooring cost estimate, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC space design cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC cement and concrete cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC masonry cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
WTC sprinkler cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate form, Mayor's Office WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate form, glass glazing WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate form, Mayor's Office WTC, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate, woodwork, World Trade Center, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Fireproofing cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Roofing cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Furniture cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Construction cost estimate form, Bureau of Space Design, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
PA Approval Correspondence for OEM Project, December 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
NYC-WTC_000172988 · page 1machine-extracted · confidence unavailable · Check page ↗
Addendum modifying specifications and drawings, May 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
FAX: Engineering correspondence and construction review, Oct 1998 · page 1machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-3, December 24, 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-4, December 28, 1998 · page 2machine-extracted · confidence unavailable · Check page ↗
Site inspection form FR-5, January 12, 1999 · page 2machine-extracted · confidence unavailable · Check page ↗
Punch list for Mayor's Office 23rd floor renovation, June 1999 · page 1machine-extracted · confidence unavailable · Check page ↗
Alternate spellings machine-read from the scans, folded into this one canonical entity.
NYC-WTC_000166787
Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000166787
Record identifier page for a document within the Mayor's Office of Emergency Management collection at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000166839
Document containing technical data and specifications for equipment used in city facilities.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000166873
Document containing technical specifications for equipment required by the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167196
Authorization form for additional architectural services regarding RF distribution system expansion at Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167198
Authorization form for scope revisions to the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167235
Fee proposal from The Cantor Seinuk Group P.C. for structural engineering services at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167237
Architectural proposal comparing two space allocation schemes for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167238
Agenda for a project meeting regarding approvals and design development progress for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167238
Agenda for a project meeting regarding approvals and design development progress for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167240
Letter from The Cantor Seinuk Group proposing structural engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167252
Detailed fee breakdown for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167284
Letter acknowledging receipt of a requisition to review final coded drawings and furniture specifications for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167291
Architectural firm proposal for design services for Mayor's Office of Emergency Management center at 7 World Trade Center, including scope of work and consultant proposals, dated…
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167294
Fee summary document detailing costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167295
Fee summary document detailing costs per square foot for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167297
Fee summary outlining costs for architectural and MEP design services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167336
Invoice for transportation and delivery services to 7 World Trade Center from transportation vendor, dated January 2000.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167337
Invoice from architectural firm for Mayor's Office of Emergency Management reimbursable expenses related to World Trade Center project, including consulting and transportation…
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167370
Reimbursable expense invoice for Mayor's Office of Emergency Management consulting and communications services.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167378
Invoice for blueprint and measurement services as reimbursable expenses to Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167387
Invoice for blueprinting and local delivery services for the 140 Broadway project covering January to June 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167390
Invoice for Mayor's Office of Emergency Management reimbursable expenses including blueprint reprographics and transportation services.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167400
Invoice for blueprint and utility reimbursement expenses related to the 7th-floor public corridors at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167403
Invoice from ground transportation company for delivery and courier services to architectural firm.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167404
Invoice for reimbursable blueprint and messenger services provided to the Mayor's Office of Emergency Management in June 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167406
Transportation/shipping charges for materials delivery to 100 Broadway location.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167406
Transportation/shipping charges for materials delivery to 100 Broadway location.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167414
Invoice for professional architectural services and labor hours related to loading dock revisions at 140 Broadway through May 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167419
Invoice for additional plan submission fees related to the 7th-floor public corridors at 7 World Trade Center through April 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167420
Invoice for reimbursable blueprint and messenger services provided to the Mayor's Office of Emergency Management through April 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167425
Invoice listing reimbursable blueprint and reprographic expenses for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167437
Invoice for architectural controlled inspection fees for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167437
Invoice for architectural controlled inspection fees for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167439
Invoice listing reimbursable blueprint expenses for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167441
Invoice listing reimbursable blueprint expenses for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167442
Invoice for professional time and expenses related to loading dock revisions at 140 Broadway.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167445
Invoice for professional time and reimbursable expenses related to loading dock revisions at 140 Broadway.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167446
Invoice for professional time and expenses related to lobby graphics at 140 Broadway.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167448
Invoice for professional time and expenses related to lobby graphics at 140 Broadway.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167449
Invoice for architectural design fees and billing for 7 World Trade Center seventh floor public corridor work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167452
Invoice for architectural design and blueprint services for 7 World Trade Center 7th floor public corridors.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167458
Invoice for professional time and expenses related to lobby graphics at 140 Broadway.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167459
Invoice for architectural design services for the Mayor's Office of Emergency Management upgraded protective wall.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167460
Invoice for security consultant design services for the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167461
Invoice for architectural design fees and billing for 7 World Trade Center seventh floor public corridor work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167462
Invoice for additional architectural and mechanical design services for Mayor's Office of Emergency Management project, billed through February 28, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167463
Invoice for architectural controlled inspection services for Mayor's Office of Emergency Management project, billed through February 28, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167463
Invoice for architectural controlled inspection services for Mayor's Office of Emergency Management project, billed through February 28, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167465
Invoice for reimbursable blueprinting and transportation expenses for Mayor's Office of Emergency Management project through February 28, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167472
Invoice for architectural services regarding loading dock revisions at 140 Broadway through February 28, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167475
Invoice for architectural services on 140 Broadway loading dock revisions project for the period through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167477
Invoice for security consultant design services provided to the Mayor's Office of Emergency Management through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167478
Invoice for additional architectural and mechanical design services for the Mayor's Office of Emergency Management through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167479
Invoice for architectural controlled inspection services for Mayor's Office of Emergency Management through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167479
Invoice for architectural controlled inspection services for Mayor's Office of Emergency Management through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167481
Invoice for architectural design services regarding public corridors on the seventh floor of 7 World Trade Center through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167483
Invoice for reimbursable technical and professional expenses for Mayor's Office of Emergency Management project work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167490
Invoice for reimbursable blueprinting and messenger service expenses for Mayor's Office of Emergency Management project through January 31, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167502
Invoice for additional design revisions related to the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167503
Invoice for architectural controlled inspections at the Mayor's Office of Emergency Management project dated January 25, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167503
Invoice for architectural controlled inspections at the Mayor's Office of Emergency Management project dated January 25, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167510
Invoice for architectural labor charges for loading dock revision design work at 140 Broadway, Jan 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167513
Invoice for architectural design services for 7th floor public corridors at 7 World Trade Center, Jan 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167516
Invoice for reimbursable blueprint and other expenses related to the Mayor's Office of Emergency Management project dated January 22, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167518
Invoice from a technology consultant for reimbursable expenses related to the Mayor's Office of Emergency Management Crisis Management Center through December 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167533
Billing for additional architectural and mechanical design services provided to Mayor's Office of Emergency Management through October 31, 1998, totaling approximately $43,000.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167534
Billing for architectural design services for rooftop microwave dishes installation at Mayor's Office of Emergency Management facility through October 31, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167535
Billing for architectural design services for lobby security revisions at Mayor's Office of Emergency Management through October 31, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167551
Invoice for security consultant design services provided to the Mayor's Office of Emergency Management through October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167552
Invoice for security consultant design services provided to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167553
Invoice for security consultant design services provided to the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167554
Invoice for additional architectural and mechanical design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167567
Invoice detailing reimbursable expenses including blueprinting and petty cash for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167568
Invoice for upgraded protective wall design and miscellaneous revisions at the Mayor's Office of Emergency Management through October 2, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167568
Invoice for upgraded protective wall design and miscellaneous revisions at the Mayor's Office of Emergency Management through October 2, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167573
Invoice for architectural design services for 7 World Trade Center seventh floor public corridors project, including blueprints and reprographic costs, October 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167577
Invoice for architectural services fees and reimbursable expenses for 7 World Trade Center seventh floor public corridors project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167583
Invoice for additional architectural and mechanical design services and reimbursable expenses for Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167585
Invoice for reimbursable expenses including blueprinting and transportation services for Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167589
Invoice for architectural services for upgraded protective wall design and miscellaneous revisions for Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167590
Invoice for audiovisual and acoustics technology consulting services for Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167591
Invoice for architectural services fees for 7 World Trade Center seventh floor public corridors project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167659
Cover sheet transmitting existing and alternate press room layout schemes for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167666
Correspondence informing that the Port Authority rejected the final request for approval of doors 40A and 40B at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167668
Memo transmitting Bulletin #1 drawings and specifications for the Mayor's Office of Emergency Management renovation at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167675
Cover sheet for a fax providing a summary of the Mayor's Office of Emergency Management project request at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167678
Correspondence confirming landlord approval of the hurricane wall design subject to the installation of water detectors.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167679
Internal memo from DCAS authorizing the commencement of work for the Mayor's Office of Emergency Management reconstruction.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167693
Document listing furniture system and loose furniture manifests for review regarding the Mayor's Office of Emergency Management space at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167696
Interdepartmental coordination memo for Mayor's Office of Emergency Management 7 World Trade Center project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167702
Interdepartmental coordination memo for Mayor's Office of Emergency Management project distribution.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167719
Cover sheet for a fax transmission regarding Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167722
Official correspondence clarifying that OEM backup generators are only used during power loss or catastrophes at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167727
Letter submitting noise level data and comments regarding the 23rd floor emergency generator room in response to OEM requirements.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167730
Correspondence requesting the basis for acoustical calculations determining noise levels in the emergency generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167731
Correspondence requesting the basis for acoustical calculations determining noise levels in the emergency generator room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167733
Cover sheet for a fax transmission regarding outstanding equipment documentation for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167737
Transmittal of responses to design development review comments for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167748
Confirmation letter from Shen Kilsow A Witke regarding requirements to finalize the audio-visual program for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167754
Transmittal of architectural plans and layout details for the Mayor's Office of Emergency Management on the 23rd floor of 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167759
Fee proposal from The Cantor Seinuk Group to provide structural engineering services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167764
Proposal for additional architectural services to create AutoCAD files for 23rd floor existing conditions at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167825
March 1998 approval letter from DCAS on mechanical specifications for Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167862
Correspondence expressing concern about painting A/V enclosure panels at the Mayor's Office of Emergency Management site.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167863
Transmittal regarding painting procedures for metal panels in the field of construction at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167864
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167865
Transmittal of a fax from Schlage regarding an exit feature request for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167866
Transmittal of preliminary door schedules, hardware schedules, and lock catalog cuts for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167869
Cover sheet for correspondence regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167870
Authorization for revised scope of architectural, electrical, and security design services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167872
Report on a roof site visit noting items related to roof shed construction for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167873
Transmittal of additional drain requirements and revised drawings for slab replacement at the loading dock.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167880
Transmittal of revised drawings specifying transformer installation in room 23-05 and panel locations for OEM.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167881
Transmittal of clarification documents and louver shop drawings for construction use at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167909
Letter instructing staff to distribute project documents to various city agencies and consultants.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167918
Correspondence regarding requested revisions to main entrance door drawings and package handling.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000167950
Document page containing illegible text or graphics from the Mayor's Office of Emergency Management records.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168009
Letter enclosing final furniture manifests and pricing summaries for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168010
Architectural firm transmits final furniture manifest and pricing summary for the Mayor's Office of Emergency Management at 7 WTC.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168063
Letter from architect providing product catalogs and pricing information for non-contract furniture items for the Mayor's Office of Emergency Management, dated June 29, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168220
Cover letter submitting revised floor diagrams for the Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168221
Distribution list for SHCA architectural drawing set for Mayor's Office of Emergency Management space at 7 World Trade Center dated November 21, 1997.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168221
Distribution list for SHCA architectural drawing set for Mayor's Office of Emergency Management space at 7 World Trade Center dated November 21, 1997.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168470
Architectural firm authorization to proceed with design services for a backup UPS system at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000168681
Memo regarding equipment deletions for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000170843
DCAS approves a consultant team to perform architectural and engineering services for the Mayor's Office of Emergency Management on the 23rd floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171251
Fax cover sheet dated August 4, 1999, transmitting a field observation report regarding the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171463
Correspondence clarifying that specific equipment models FSK-56A and 56D are not suitable for the project requirements.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171747
Transmission of a route drawing for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171807
Fax transmission of structural sketches supporting change order number 23 for beam penetrations on the seventh floor.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171895
DCAS authorizes scope revisions for the Mayor's Office of Emergency Management at 7 World Trade Center on November 6, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171905
Letter from consulting engineers to the Mayor's Office of Emergency Management concerning Order #016 at 7 World Trade Center on October 16, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171982
Contractor letter submitting a credit change order to remove costs associated with emergency generator field testing.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000171987
Authorization form issued to proceed with revised scope of services for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172010
Authorization form issued to proceed with revised scope of services and expense reporting for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172095
Engineering consultants' specification document for 7 World Trade Center project, September 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172165
Document excerpt listing specifications for a fuel oil room access hatch and referencing a self-closing modification memo.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172168
Memorandum confirming contact with vendors to produce wiring diagrams and pricing for modifying the fuel oil tank room hatch.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172197
Form authorizing revised scope of services for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172233
Transmittal sheet for fuel line enclosure framing and pipe routing drawings dated May 10, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172253
Fragmented text from a Citywide Administrative Services form with illegible content.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172268
Minutes of the eighteenth consultant meeting covering project status updates for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172273
Delivery schedule for computer equipment at 7 World Trade Center requiring electrician assistance for transport to the PIU room.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172283
Bureau of Space Design document estimating construction costs for the Mayor's Office of Emergency Management program at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172327
Addendum #1 to a construction cost estimate form for HVAC work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172398
Form dated May 27, 1998 providing a construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172404
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172406
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172408
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172410
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172433
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172440
Cost estimate form for space design at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172442
Department of General Services construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172444
Department of General Services construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172447
Department of General Services construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172472
Addendum to a construction cost estimate regarding electric fixtures for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172478
Department of General Services addendum estimating construction costs for the Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172482
Department of General Services addendum estimating costs for cement and concrete work for the Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172487
Department of General Services addendum estimating costs for sprinkler installation for the Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172493
Department of General Services addendum estimating costs for unspecified trades for the Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172500
Department of General Services addendum estimating costs for electric and fixtures work for the Mayor's Office at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172546
Report from technology consultants regarding system checkout findings for Mayor's Office of Emergency Management facility, dated July 20, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172549
Letter from technology consultants submitting findings from a system checkout for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172596
Bureau of Space Design construction cost estimate for HVAC work and space design for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172605
Cost estimate form for construction work at the Mayor's Office located at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172610
Cost estimate document for iron and steel construction at the Mayor's Office in the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172614
Cost estimate document for sprinkler system construction at the Mayor's Office in the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172620
Department of General Services form estimating construction costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172631
Department of General Services form estimating construction costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172639
Department of General Services form estimating costs for drywall and carpentry work at the World Trade Center for the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172649
Department of General Services form estimating construction costs for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172655
Bureau of Space Design construction cost estimate form for the Mayor's Office of Emergency Management at the World Trade Center dated May 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172663
Bureau of Space Design construction cost estimate form for the ceiling trade at the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172669
Bureau of Space Design construction cost estimate form for the electric and fixtures trade at the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172690
Bureau of Space Design form estimating HVAC trade costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172702
Bureau of Space Design form estimating plumbing trade costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172711
Bureau of Space Design form estimating painting and wallcovering costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172719
Bureau of Space Design form estimating floor, base, and carpet costs for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172728
Construction cost estimate form for the Mayor's Office of Emergency Management at the World Trade Center dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172735
Construction cost estimate form for cement and concrete work at the World Trade Center for the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172746
Construction cost estimate form for masonry and plaster work at the World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172756
Construction cost estimate form for sprinkler work at the World Trade Center for the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172767
Department of General Services construction cost estimate form for the Mayor's Office program at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172772
Department of General Services construction cost estimate form for the glass and glazing trade at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172781
Department of General Services construction cost estimate form for the Mayor's Office program at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172793
Cost estimate form for woodwork construction and design at the World Trade Center site.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172815
Bureau of Space Design construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center, dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172824
Bureau of Space Design construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center, dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172832
Bureau of Space Design construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center, dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172834
Bureau of Space Design construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center, dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172839
Bureau of Space Design construction cost estimate for the Mayor's Office of Emergency Management at the World Trade Center, dated May 27, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172844
Bureau of Space Design construction cost estimate form dated May 27, 1998 for the Mayor's Office of Emergency Management at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172846
Bureau of Space Design construction cost estimate form dated May 27, 1998 for fireproofing work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172850
Bureau of Space Design construction cost estimate form dated May 27, 1998 for roofing and waterproofing work at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172856
Bureau of Space Design construction cost estimate form dated May 27, 1998 for furniture procurement at the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172878
Blank construction cost estimate form from the Bureau of Space Design dated May 27, 1998 for the Mayor's Office of Emergency Management at the World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000172987
Correspondence regarding professional authorization approval for the Mayor's Office of Emergency Management project at 7 World Trade Center.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173191
Transmittal letter issuing an addendum that modifies project specifications and drawings dated May 4, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173442
Fax cover transmitting a value engineering comparison between change order #4 and exhibit A for the 7 WTC construction project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173555
Architectural firm observation regarding ceiling conditions on the 23rd floor at OEM offices following site walkthrough.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173707
Correspondence clarifying existing electrical provisions for a refrigerator and coffee machine at the Mayor's Office.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173710
Transmitted fax containing professional engineering correspondence related to construction activities at a city facility.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173720
Cover page for a fax transmission concerning the Mayor's Office of Emergency Management project status or requirements.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173807
Memo distributing equipment deletion details for a value engineering package at the World Trade Center site.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173900
Fax transmission of revised structural engineer comments for use by the contractor and city agency officials.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173900
Fax transmission of revised structural engineer comments for use by the contractor and city agency officials.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173947
Covering fax transmitting memos requested during a meeting regarding the Mayor's Office of Emergency Management project.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000173948
Memo confirming that stainless steel cladding for generator louvers is an aesthetic preference with no operational impact.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174016
Form recording site access authorization for contractor personnel at 7 World Trade Center on January 12, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174016
Form recording site access authorization for contractor personnel at 7 World Trade Center on January 12, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174022
Cover letter fax dated January 22, 1999, transmitting attached forms FSK-56A and FSK-56D regarding site work.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174030
Form FR-1 recording site access and activities at the Mayor's Office location on November 17, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174031
Form FR-2 recording site access and activities at the Mayor's Office location on November 24, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174032
Form FR-3 recording site access and activities at the Mayor's Office location on December 24, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174032
Form FR-3 recording site access and activities at the Mayor's Office location on December 24, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174034
Form FR-4 recording site access and activities at the Mayor's Office location on December 28, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174034
Form FR-4 recording site access and activities at the Mayor's Office location on December 28, 1998.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174036
Form FR-5 recording site access and activities at the Mayor's Office location on January 12, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174036
Form FR-5 recording site access and activities at the Mayor's Office location on January 12, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174127
Document listing items requiring correction following site inspections of the 23rd floor at 7 World Trade Center for the Mayor's Office of Emergency Management on June 22-23, 1999.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗NYC-WTC_000174143
Transmittal form requesting HVAC plans and balancing reports for the 23rd floor systems at 7 World Trade Center for the Mayor's Office of Emergency Management.
Citywide Administrative Services, Dept. of · Box 7DCAS
machine-extracted · confidence 1.00 · Check page ↗Boxes, folders and agencies this entity's source pages are filed under. Folder labels are omitted to avoid surfacing personal names.
Volume NYC-WTC0007.
Document record NYC-WTC_000166786, Citywide Administrative Services · page 1machine-extracted · confidence 1.00 · Check page ↗
Document record NYC-WTC_000166786, Citywide Administrative Services · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Technical data sheet for equipment specifications, 2003 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Specifications for OEM equipment at 7 WTC, undated · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000172988 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Additional services authorization form, June 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional services authorization form, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional Services Authorization #5576CH, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000167217 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000167224 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000167225 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fee proposal for structural engineering services, Dec 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Structural engineering fee proposal for OEM, Dec 17, 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
OEM space allocation scheme comparison, Nov 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Meeting agenda for OEM design development, Jan 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Meeting agenda for OEM design development, Jan 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee summary for OEM project design, Oct 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Acknowledgment of requisition for OEM drawings review, Oct 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Architectural and engineering design services proposal, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM 7 WTC Design Services, Oct 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM Design Services at 7 WTC · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fee Summary for OEM 7 WTC Design Services, Sept 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Transportation service invoice, 7 World Trade Center, January 2000 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architect reimbursable expenses invoice, February 2000 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167344 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167364 · page 1machine-extracted · confidence 1.00 · Check page ↗
Mayor's Office Emergency Management reimbursable expenses, Dec 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
MOEM reimbursable expenses invoice, September 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Blueprint and delivery invoice, 140 Broadway, Jul 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural reimbursable expenses invoice, June-August 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, 7 World Trade Center, August 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Ground transportation services invoice, May 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, Mayor's Office of Emergency Management, June 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Shipping charges invoice, April 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Shipping charges invoice, April 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Professional services invoice, 140 Broadway revisions, June 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167417 · page 2machine-extracted · confidence 1.00 · Check page ↗
Fee invoice, 7 World Trade Center corridor submissions, May 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, May 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167423 · page 2machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, April 26, 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, controlled inspections, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, controlled inspections, Apr 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, blueprint costs, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, blueprint costs, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 7 WTC corridors, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 7 WTC corridors, Apr 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway lobby graphics, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, protective wall design, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, security design, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 7 WTC corridors, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, Mayor's Office additional design services, March 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural controlled inspection invoice, March 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural controlled inspection invoice, March 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, MOEM, March 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 140 Broadway loading dock, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, Mayor's Office emergency management, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, emergency management additional services, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural controlled inspection invoice, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural controlled inspection invoice, Feb 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 7 WTC corridor, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, MOEM, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, MOEM, Feb 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167493 · page 1machine-extracted · confidence 1.00 · Check page ↗
Design revision invoice, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural inspection invoice, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural inspection invoice, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Loading dock revision design labor, 140 Broadway, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
7th floor corridor design services, 7 WTC, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Telecommunications consultant invoice for crisis center, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Invoice for Mayor's Office Emergency Management design, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Invoice for rooftop microwave dishes design, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Invoice for lobby security revisions design, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence 1.00 · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence 1.00 · Check page ↗
Security consultant design invoice, Mayor's Office of Emergency Management, Oct · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural and mechanical design invoice, Mayor's Office of Emergency Management, · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expense invoice, Mayor's Office of Emergency Management, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural design invoice, MOEM protective wall, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural design invoice, MOEM protective wall, Oct 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Design services invoice, 7 WTC corridor project, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services invoice, 7 WTC public corridors, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional architectural and mechanical design services, MOEM, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Reimbursable expenses invoice, MOEM project, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Upgraded protective wall design services invoice, MOEM, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Audiovisual and acoustics consulting invoice, MOEM, Aug 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Architectural services fee invoice, 7 WTC corridors, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fax regarding door release approval rejection, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fax transmittal: OEM project documents, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional Services Authorization for UPS design, 7 WTC, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000172990 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fax cover sheet regarding MOEM project at 7 WTC, Oct · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000167473 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000167473 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax cover sheet with press room layouts, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo transmittal of Bulletin #1 drawings and specs, July 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax cover sheet for project correspondence, June 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Letter on hurricane wall design approval, June 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Project coordination memo, MOEM 7 World Trade Center, April 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Project status memo, MOEM 7 World Trade Center, April 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fax transmittal for OEM design documents, Mar 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo authorizing reconstruction contract commencement, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Furniture Manifests for OEM Space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Letter re: OEM emergency generator usage definition, Mar 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Letter re: noise levels for generator room, Mar 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Letter re: basis of noise level calculations, Mar 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Letter re: basis of noise level calculations, Mar 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax transmittal re: OEM equipment memo, Feb 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
DCAS response to DD architectural drawings, Feb 20, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
A/V program confirmation memo, 7 WTC, Jan 31, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Architectural plan transmission for OEM 23rd floor, Jan 31, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Architectural design services proposal, 7 WTC, October 1997 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Specification approval memo, 7 WTC, March 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax: Concerns regarding painting A/V enclosures, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo: Painting metal panels, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo: Schlage exit feature request, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo: Door and hardware schedules, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax transmittal: OEM project documents, Feb 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Additional services authorization: OEM security revisions, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional Services Authorization form for OEM audio-visual work, Mar 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo: Roof shed construction site visit, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo: Drainage and slab replacement drawings, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo: Transformer and panel installation locations, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo: FSK clarifications and louver shop drawings, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo requesting document distribution for OEM project, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo requesting drawing revisions for main entrance doors, Sep 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Unreadable document excerpt · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Transmittal letter for OEM furniture manifest at 7 WTC, Jun · page 1machine-extracted · confidence 1.00 · Check page ↗
Letter Transmittal of Final Furniture Manifest for MOEM, June 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Pricing and cuts for non-contract OEM furniture, June 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
OEM 7 World Trade Center Floor Diagram Revision · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Distribution list, 7 World Trade Center 23rd floor SHCA drawing, · page 1machine-extracted · confidence 1.00 · Check page ↗
Distribution list, 7 World Trade Center 23rd floor SHCA drawing, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Equipment Deletion Memo, 7 World Trade Center, Sept 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Approval of architectural team for OEM 23rd floor project, Feb · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000171247 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Field observation report fax cover, 7 WTC OEM, Aug 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo regarding FSK-56A and 56D specifications at 7 WTC, Jan · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax memo regarding 7 WTC route drawing, June 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Engineering sketches for beam penetrations, 7 WTC, Dec 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Correspondence regarding OEM Order #016, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Credit change order #014 submission for Mayor's OEM at 7 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Additional Services Authorization for OEM project, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Additional Services Authorization for OEM project, 7 World Trade Center, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Engineering consultation Exhibit A, 7 World Trade Center · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Product specification sheet for fuel oil room access hatch, March · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Architect memorandum regarding fuel oil room inspection request, March 2000 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fuel line framing plan transmittal, May 10 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Unidentified form excerpt from DCAS, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site access form, 7 World Trade Center, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site access form, 7 World Trade Center, Jan 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-1, November 17, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-2, November 24, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-3, December 24, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-3, December 24, 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-4, December 28, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-4, December 28, 1998 · page 2machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-5, January 12, 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Site inspection form FR-5, January 12, 1999 · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000172254 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Consultant meeting minutes #18, Nov 24 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000172269 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Schedule of computer deliveries, Dec 4 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Construction cost estimate for OEM World Trade Center project · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate addendum for HVAC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's Office of Emergency Management, May · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, World Trade Center, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate addendum, World Trade Center, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC space design cost estimate addendum, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC cement and concrete cost estimate addendum, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC sprinkler system cost estimate addendum, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC unspecified trade cost estimate addendum, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC electric fixtures cost estimate addendum, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction Cost Estimate for MOEM Space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's Office at WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for iron and steel work at WTC, · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for sprinkler work at WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction Cost Estimate Form, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction Cost Estimate Form, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate form, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, Mayor's Office of Emergency Management, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, ceiling trade, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, electric fixtures, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
HVAC construction cost estimate, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Plumbing construction cost estimate, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Painting cost estimate, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Flooring cost estimate, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC space design cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC cement and concrete cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC masonry cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
WTC sprinkler cost estimate, Mayor's Office, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate form, Mayor's Office WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate form, glass glazing WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate form, Mayor's Office WTC, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate, woodwork, World Trade Center, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for Mayor's OEM, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Fireproofing cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Roofing cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Furniture cost estimate for 7 WTC OEM space, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Construction cost estimate form, Bureau of Space Design, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Technology consultants system checkout report, July 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
System checkout report for OEM at 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
NYC-WTC_000172976 · page 1machine-extracted · confidence 1.00 · Check page ↗
NYC-WTC_000172977 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
PA Approval Correspondence for OEM Project, December 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Addendum modifying specifications and drawings, May 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Value engineering memo, 7 World Trade Center, September 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Ceiling inspection memo, 7 World Trade Center OEM, Nov 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
FAX: Refrigerator and coffee machine clarification, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
FAX: Engineering correspondence and construction review, Oct 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Equipment deletion distribution memo, value engineering package, 1998 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Transmittal of revised structural engineering comments, 7 World Trade Center, · page 1machine-extracted · confidence 1.00 · Check page ↗
Transmittal of revised structural engineering comments, 7 World Trade Center, · page 2machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax covering requested memos from meeting, Jan 5, 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Memo on generator louver cladding, OEM 7 WTC, Jan 5, · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Fax covering FSK-56A and FSK-56D attachments, Jan 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Punch list for Mayor's Office 23rd floor renovation, June 1999 · page 1machine-extracted · confidence 1.00 · Check page ↗
Volume NYC-WTC0007.
Drawing request form for OEM work at 7 World Trade, · page 1machine-extracted · confidence 1.00 · Check page ↗