NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/Answers by Vikonics Items
Document / 2 pages

Answers by Vikonics Items

Label derived from the City's folder field. The City does not supply document titles.NYC-WTC_000167225–000167226
Page image
Scanned page image, NYC-WTC_000167225
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

HAYDEN CONNELL ARCHITECTS goi e4i zT^p. ^235 ?. 7/3p.oz ' i 370 North Street Teterboro, NJ 07608

VIKONICS February 2,1998

Mr. Joseph J. Allotta AIA SW ANKE HAYDEN CONNELL ARCHITECTS 295 Lafayette Street New York, NY 10012 I Dear: Joe I 1 he pe the following answers satisfy your questions. If there are any further questions, please call as J OU stated time to complete the required design is short. Vikonics will invoice on an item by item basis as delivered, except for Item 7, which will be invoiced on a meeting or site visit .basis. Noimal Vikonics payment terms are as previously stated. If '* consultant * payments, on *this project, are to be made on a "paid when paid" basis this is acceptable, provided this does not in any case exc sed 45 days from date of invoice. The out-of-pocket expense limitation is acceptable.

Aj ______________________ J: mi- Task A, on the sample proposal provided, was to write and discuss with the customer a security concept report. At the meeting held on 1/26/98 Vikonics was told this task was not, Y necessary beewse of the discussions already held with the OEM security officer. That is why it , was) not included in our proposal. Die Bill of Materials provided under Item 2 would list all security materials and their estimated costs. Vikonics will not estimate the installation costs required. Qi Under this item, Vikonics provides final design of the Security system. This is to COI list of a Bill of Materials, equipment placement and riser diagram. It is intended that ; irity door and wall hardware design will be coordinated with SHCA. An outline SI iification can be provided but the specifications were deferred to Item 6 because of the ' v t t time frame (3 weeks ARO for Items 1 through 5). Item 3.4. S; The device matrix will include all devices that r equire electrical connection with details of what electrical cables will be required between all security devices. The full security performance specification is Item 6. It will contain a Statement of Work for the contractor, required performance of items supplied, and testing or certificates that are i reqt ired to assure compliance to the performance requirements.

TeleptKJTK 2i 1-641-8077 Fax 201-641^7728

NYC-WTC_000167225

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000167225Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Fax transmission log, Feb 1998 · Box 7DCAS

NYC-WTC_000167216

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167234.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.919

machine-extracted · confidence unavailable · Check page ↗
Fax cover sheet, OEM design proposal, June 1998 · Box 7DCAS

NYC-WTC_000171248

Cover sheet for a fax transmission regarding architectural and engineering design services for the Mayor's Office of Emergency Management at 7 World Trade Center.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.871

machine-extracted · confidence unavailable · Check page ↗
Meeting record, OEM project, Jan 1998 · Box 7DCAS

NYC-WTC_000170874

Record of a meeting involving the Mayor's Office of Emergency Management and construction contractors at 7 World Trade Center.

1 shared non-person entities · Same agency, volume and box · similarity 0.865

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Fax transmission log, Feb 1998 · Box 7DCAS

NYC-WTC_000167216

One-page fax transmission log for documents regarding the Mayor's Office of Emergency Management project identified by document number NYC-WTC_000167234.

Similar indexed content

Compare copies and versions →