NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 26, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 26, 2009, by TRC Environmental Corp.

NYC-WTC_000182028
Page image
Scanned page image, NYC-WTC_000182028
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/26/09 Floor iZip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:30 am to 9:35 am

I arrived at the premise at 8:30 am. LVI schedule informed that activities include: scrape fireproofing, clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations on 2""' floor, clear floor, cut ducts, demo walls, ceilings on 1^’ floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on S'^loor. One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.033.

3'“ Floor - I observed 35 workers on the floor. Fireproofing removal at the areas 9-10 was completed, workers were washing and cleaning beams, columns, platforms of the scaffolds, picking up debris from the floor, placing into the boxes, cleaning the floor. Workers were plasticizing the floor and critical barriers of the area 13 preparing for fireproofing removal. Others were preparing boxes. 3 sealed Gaylord boxes were on the floor. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2"“ floor. 2"'' Floor - 48 workers were found inside the work area, scraping fireproofing and spraying with amended water at the area 9 of the high ceiling vestibule. At the west side of vestibule two workers were harnessed in scissor lift demolishing metal and glass partition. Fireproofing removal at the hallways 10 and 11 was completed and workers were washing and cleaning poly of the critical barriers, picking up gross debris, cleaning the floor. Other workers were plasticizing the floor at the shaft area, preparing boxes. 8 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 1^’ floor. 1’* Floor - 67 workers were on the floor. Workers in scissor lifts, wearing harnesses and attached to a life safety line, were cutting pipes, air ducts, metal fixtures from the ceiling at the various locations of the work area, removing insulation, cutting and demolishing metal partition; cutting conduit and clearing off shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. Inside of mechanical room two workers were observed taking apart conditioner; workers on mezzanine were demolishing metal frame and glass partition. A large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 3'“ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial , ,

Borough 1 “Manhattan 2=Bronx 3=Brooklyn 4=Queens .'“Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2“TJo Violation Issued 3“No access 4“Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131190

NYC-WTC_000182028

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182028Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →