Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 7, 2009 by TRC Environmental Corp.

NYC-WTC_000182006
Page image
Scanned page image, NYC-WTC_000182006
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/07/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:00 am to 9:20 am

I arrived at the premise at 8:05 am. LVI schedule informed that activities include: remove walker ducts and raceways on 6*'' floor, scrape fireproofing, clear off floor, temp platforms in shaft on O’Y^oor, demo walls, clear off floor, scrape fireproofing, erect platforms various locations on 2"“ floor, clear floor, cut ducts, demo walls, ceilings on V floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on B'^'floor Two workers were present for the decon maintenance.

3'“ Floor - 38 workers were present inside the work area. Workers on scaffolds were scraping fireproofing at the area 5, washing scaffolds, picking up debris, cleaning the floor, placing debris into the boxes. On the south side shaft workers were plasticizing platform with 6 mil poly; others were cutting metal and placing into the I boxes, spraying with amended water, preparing boxes. 3 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stainwell to proceed to the 2"'“ floor.

2"'* Floor - 58 workers were found inside the work area. Workers on 5 scaffolds were scraping fireproofing at I the area 5, spraying with amended water, cleaning the floor. Eagle scaffolding workers setting up platforms at the south side shaft area. Platinum Electrician worker were replacing the light bulbs at the deck. Other workers were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 18 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the V’ floor.

1’* Floor - 72 workers were on the floor. Workers on scissor lifts at the various locations were cutting and removing heating pipes; demolishing the brick wall and spraying with amended water; workers on scissor lifts were removing hard concrete drop ceiling, removing black metal panels from the columns at the south/east side of the work area, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations'into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stainwell to go back to the 3'Yloor.

After following the decontamination procedure I signed the log book and used north hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor's Initial _________ Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5-Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131151

NYC-WTC_000182006

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182006Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →