NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/07/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:00 am to 9:20 am
I arrived at the premise at 8:05 am. LVI schedule informed that activities include: remove walker ducts and
raceways on 6*'' floor, scrape fireproofing, clear off floor, temp platforms in shaft on O’Y^oor, demo walls,
clear off floor, scrape fireproofing, erect platforms various locations on 2"“ floor, clear floor, cut ducts,
demo walls, ceilings on V floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment
to enter the regulated area on B'^'floor Two workers were present for the decon maintenance.
3'“ Floor - 38 workers were present inside the work area. Workers on scaffolds were scraping fireproofing at
the area 5, washing scaffolds, picking up debris, cleaning the floor, placing debris into the boxes. On the south
side shaft workers were plasticizing platform with 6 mil poly; others were cutting metal and placing into the I
boxes, spraying with amended water, preparing boxes. 3 Gaylord boxes were ready to be taken out. Inspection
was done on micro trap machines and tents.
I used B stainwell to proceed to the 2"'“ floor.
2"'* Floor - 58 workers were found inside the work area. Workers on 5 scaffolds were scraping fireproofing at I
the area 5, spraying with amended water, cleaning the floor. Eagle scaffolding workers setting up platforms at
the south side shaft area. Platinum Electrician worker were replacing the light bulbs at the deck. Other workers
were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 18
Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered
on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the V’ floor.
1’* Floor - 72 workers were on the floor. Workers on scissor lifts at the various locations were cutting and
removing heating pipes; demolishing the brick wall and spraying with amended water; workers on scissor lifts
were removing hard concrete drop ceiling, removing black metal panels from the columns at the south/east side
of the work area, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal
at the various locations'into the pieces, preparing, wrapping and loading out boxes through the waste decon. A
large amount of debris and poly wrapped beams exists on the floor. 15 Gaylord boxes were on the floor ready
for load out. Inspection was done on micro trap machines and tents.
I used B stainwell to go back to the 3'Yloor.
After following the decontamination procedure I signed the log book and used north hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor's Initial
_________
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5-Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property