NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/02/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 1 b (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:05 am to 10:25 am
I arrived at the premise at 9:05 am, proceeded to the decon, signed the log book, don the appropriate level of
personal protective equipment to enter the regulated area on 2"‘’floor. One person was present for the decon
maintenance, cleaning the shower chamber. I used B stairwell to proceed to the 3"* floor.
3'“ Floor - 33 workers were present on the floor, cutting metal fixtures from the ceiling, spraying around the
area with amended water. Carpenters working with plywood, building the platforms across shafts. Electricians
setting up electrical room, plasticizing inside with 6 mil poly, wrapping the cables. Workers on scissor lifts at the
south extended area were removing insulation and taking down air ducts; cutting metal fixtures.at the south
side decon, were cutting air duct to remove and cut into the pieces. 4 Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 2'"’ floor.
2"“ Floor - 33 workers were found inside the work place, cutting and removing black metal panels from the
columns at the east side work area. Workers on scissor lifts at the south/east side vestibule were cutting metal
fixtures from the ceiling. Electricians inside the electrical room were cutting dead pipes and plasticizing the
room with poly. Workers demolishing the brick wall at the south/east side, spraying around the area with
amended water, picking up debris, placing into the black asbestos bags; cutting metal using tools attached to
the HEPA vacuum, others spraying the area with amended water, wrapping beams with poly, preparing boxes.
3 Gaylord boxes were on the floor sealed, sprayed and ready for load out.
I used B stairwell to proceed to the V floor.
1“ Floor - 42 workers on the floor. Electricians were working with the wires at the electrical panel. Workers ion
scissor lifts were removing and drop ceiling, spraying with amended water; clearing the shafts from debris,
placing into the boxes and spraying with water, cutting metal at the various locations, preparing, wrapping and
loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the
floor. 8 Gaylord boxes were on the floor ready to be taken out. Inspection was done on micro trap machines
and tents.
I used B stairwell to go back to the S'^floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s^tial
Borough I-Manhattan 2-Bronx 3-Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family L) school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131155
NYC-WTC_000182010