Asbestos inspection log, 130 Liberty Street, Feb 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on February 16, 2009, by TRC Environmental Corp.

NYC-WTC_000182033
Page image
Scanned page image, NYC-WTC_000182033
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 02/16/09 Eloor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:00 am to 10:30 am I arrived at the premise at 9:00 am, proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 8“' floor. 8‘''Floor - 7 workers were present at the North vestibule, jack hammering the floor using crow bar with HEPA vacuum attached to remove walker ducts, fine spraying with amended water has been performed; two other workers were picking up debris, placing into the black asbestos waste bags. One micro trap machine was powered on and 1 on stand by. After following the decontamination procedure I signed the log book and used south hoist to go to the 4"' floor.l proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. Negative air pressure on the floor was 0.032. One worker was present for the decon maintenance. 4"' Floor - 25 workers were present on the floor, washing, sweeping and vacuuming the floor with equipment equipped with HEPA filters, fine cleaning horizontal and vertical surfaces at the spandular beams, critical barriers, at the south side of the work area, re-sealing the critical barriers, replacing the filters, clearing off the floor, preparing for the visual inspection. I observed that 1 light bulb protection was open. I took the picture and advised Handler Supervisor, who directed Platinum Electrician worker to repair the cage in concern. 3 Gaylord boxes were ready to be taken out. I used B stairs to proceed to the 3'Yloor 3’'“ Floor - 28 workers were working on the floor. Workers on the scissor lift were in the process of removing air ducts, beams, using hammer and power tools, attached to the HEPA vacuum, taking down the drop ceiling at the east side of the area, removing metals from the ceiling at the east side vestibule, cutting metal using the tools with HEPA vacuum attached, demolishing the wall between two shafts, cutting pipes on the floor at the north/west side vestibule. Others were loading out boxes and poly wrapped beams, which has been sprayed with amended water, picking up debris, preparing boxes. 15 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2"'’ floor. 2"” Floor - 53 workers were found inside the work place. Workers on scaffolds at the east side of the area were removing metal fixtures from the ceiling at the various locations of the floor, cutting metal into the pieces, using power tool with HEPA vacuum attached, spraying the area with amended water, demolishing the air duct, removing metal ceiling components; carpenters working with wood erecting platforms at the east side of the work area. Other workers were picking up debris from the floor, placing into the boxes and spraying with amended water, wrapping beams with poly, preparing boxes. 22 Gaylord boxes were on the floor sealed, sprayed and ready for load out, 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the floor. V Floor - 34 workers were clearing off the floor. A large amount of debris and poly wrapped beams exists on the floor. Workers at the east side of the work area were cutting air ducts, demolishing the wall at the north side, cutting debris and placing into the boxes, spraying the work areas with amended water, replacing the filters of micro trap machines, preparing, wrapping and loading out boxes through the waste decon, 10 sealed and 7 open Gaylord boxes were on the floor. I observed that debris into two Gaylord boxes were dry. Handlers Supervisor was advised, who directed workers to wet the debris and boxes with amended water before taking them out. I used B stairwell to proceed to the 4'" floor. After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough I “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131201

NYC-WTC_000182033

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182033Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →