Asbestos inspection log, 130 Liberty Street, Feb 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on February 16, 2009, by TRC Environmental Corp.

NYC-WTC_000182034
Page image
Scanned page image, NYC-WTC_000182034
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No, Inspection Date: 130 Liberty Street 02/16/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M,Gagnidze_____ F TRU2068MN08 yes Contractors Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr, Proj. Mgr/TRC Environmental 2:25 pm to 3:25 pm

I arrived at the premise at 2:25 pm, proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 4“’ floor. Negative air pressure on the floor was 0.038. One worker was present for the decon maintenance. A*” Floor - 25 workers were present on the floor, wrapping and elevating the electrical cables, washing, sweeping and vacuuming the floor at the north/east side of the work area with equipment equipped with HEPA filters, fine cleaning horizontal and vertical surfaces at the spandular beams, clearing off the floor, preparing for visual inspection. 4 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairs to proceed to the 3"Tloor. 3'^^' Floor - 28 workers were working on the floor, demolishing the sheetrock wall between two shafts; taking down drop ceiling to remove the insulation and cut and demolish the air duct at the east and north side of the area; workers on the scissor lift were in the process of removing air ducts, removing metals from the ceiling at the east side vestibule, wrapping beams with poly, cutting metal using the tools with HEPA vacuum attached, cutting pipes on the floor at the north/west side vestibule. Others were loading out boxes and poly wrapped beams, picking up debris, preparing boxes. 12 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2"'^ floor. 2'"' Floor - 53 workers were found inside the work place, demolishing the air ducts and pipes inside the mezzanine, located between 2'"’ and V' floors; plasticizing the platforms, built above the escalator shaft at the east side of the area; cutting pipes and metal fixtures from the ceiling at the shaft, demolishing stairs at the south/east side. Others cutting metal into the pieces, using power tool with HEPA vacuum attached, spraying the area with amended water, removing metal ceiling components; picking up debris from the floor, placing into the boxes and spraying with amended water, wrapping beams with poly, preparing boxes. 15 Gaylord boxes were on the floor sealed, sprayed and ready for load out. Filters of micro trap machines were dirty. Handler Supervisor was advised, and 2 workers replaced the filters. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 1'* floor. 1” Floor - 34 workers were clearing off the floor. Workers on ladders and scissor lifts were cutting air ducts, demolishing the wall at the north side, cutting debris and placing into the boxes, spraying the work areas with amended water, preparing, wrapping and loading out boxes through the waste decon, A large amount of debris and poly wrapped beams exists on the floor. 15 sealed and 10 open Gaylord boxes were on the floor. I used B stairwell to proceed to the 4*^ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2____________________ NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=Manhattan 2=Bronx 3-Brooklyn 4=Queens 5=Richmond Building Type -A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000131202

NYC-WTC_000182034

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182034Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →