NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection report, 130 Liberty Street, October 2008

Machine-extracted title · confidence 95%

Inspection record for asbestos at 130 Liberty Street conducted on October 3, 2008 by TRC Environmental Corp.

NYC-WTC_000181939
Page image
Scanned page image, NYC-WTC_000181939
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date; 130 Liberty Street 10/03/08 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU0086MN08 No Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State ‘ Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY TililW (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:05 pm to 2:30 pm

I arrived at the premise at 1:05 pm. LVI schedule informed that activities include demo shafts, boxing debris, direct installing fall protection cables on 11'” floor, scrape fireproofing, boxing debris. Eagle putting platform across shafts on lO” Floor, demo box debris on 9'” & 8'” floors.

I proceeded to the decon, followed all precautions necessary and entered containment on 11*’ floor. Negative air pressure on the floor was 0.065.

11'” Floor- 14 workers were performing work on site, inspecting and re-sealing the critical barriers, cleaning floor, removing pipe insulation on south side area, removing sheetrock inside the shaft area, spraying the area with amended water, placing debris to the boxes and spraying with water. One worker was working with his arms exposed, he was advised to cover his arms and tape with duct tape. Electrical cables were covered with poly. Workers were preparing boxes. 20 Gaylord boxes were ready for load out. 20 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. Air monitoring pumps were on. I used B stairs to proceed to the 10’” Floor. 10'” Floor - 44 people were present on site. Carpenters were cutting plywood and constructing the Platform across the shaft. Other workers on 6 scaffolds on north/east site of work area were scraping, cleaning the ceiling and spraying with amended water, removing the sheetrock in the shaft area and pipe insulation on the east side, spraying area with amended water, preparing boxes, removing debris from the ground and placing into the boxes, fine spraying with amended water. 9 Gaylord boxes were ready for load out. 20 micro trap machines were powered on and 5 were on stand by. Inspection was done on micro trap tents. Using B stairwell I proceeded to the 9'” Floor. 9” Floor -14 workers on the floor were found in the process of demolishing the brick wall next to the electrical room, using jack hammer with HEPA vacuum attached, removing the sheetrock around the shaft area, cutting metal fixtures from the ceiling, spraying the area with amended water. 35 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairs to proceed to the 8'” Floor. 8’” Floor - 16 workers were present on the floor. A large amount of poly wrapped beams exists on the floor. Workers were removing metal pipes and fixtures from the ceiling, cutting electrical cables, cutting metals, placing into the boxes and spraying with amended water, preparing boxes, removing debris from the floor. 9 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. Using B staircase I went back to the 11’” floor.

After following the decontamination procedure I signed the log book and used north hoist to get to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough 1 “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=R.ichmond Building Type A >6 stories D <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

CITY_DEP_WORBY_CANNATA_SUBP_000130910

NYC-WTC_000181939

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181939Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →