Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/06/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:45 pm to 2:50 pm
I arrived at the premise at 1:45 pm. LVI schedule informed that activities include: scrape fireproofing, clear off
floor, temp platforms in shaft on S'^floor, demo walls, clear off floor, scrape fireproofing, erect platforms various
locations on 2"'' floor, clear floor, cut ducts, demo walls, ceilings on 1®' floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 2"^floor. One worker was present for the decon maintenance.
I used B stairwell to proceed to the 3™ floor.
3'“ Floor - 42 workers were found on the floor in the process of: scraping fireproofing at the area 5, cleaning
the platforms of the scaffold, sweeping floor, picking up debris, placing into the boxes; sealing the dock at the
north side hallway, plasticizing the platform with poly. Workers at the south side vestibule were cutting metal
and placing into the boxes, spraying with amended water, wrapping beams with poly, preparing and loading out
boxes. 22 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 2"“ floor.
2"*^ Floor - 58 workers were present. Workers on 5 scaffolds were scraping fireproofing at the area 5, spraying .
with amended water, cleaning the floor, re-sealing the critical barriers and floor. Eagle scaffolding workers
setting up the platforms across shaft. Workers were cutting metal using tools attached to the HEPA vacuum,
wrapping beams with poly, preparing boxes. 65 Gaylord boxes were on the floor sealed, sprayed and ready for
load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the V’ floor.
1“ Floor - 81 workers were present. Platinum Electricians were cutting conduit inside the electrical room.
Workers on ladders were demolishing the brick wall, using hammer, spraying with amended water. Workers on
scissor lifts at the various locations were cutting heating pipes; taking down hard concrete drop ceiling, clearing
shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations
into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris
and poly wrapped beams exists on the floor. 22 Gaylord boxes were on the floor ready for load out. Inspection
was done on micro trap machines and tents.
I used B stairwell to go back to the 3''‘floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Superv^^'s Initial
Borough I “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property