NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 6, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 6, 2009, by TRC Environmental Corp.

NYC-WTC_000182012
Page image
Scanned page image, NYC-WTC_000182012
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/06/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner’s Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:45 pm to 2:50 pm

I arrived at the premise at 1:45 pm. LVI schedule informed that activities include: scrape fireproofing, clear off floor, temp platforms in shaft on S'^floor, demo walls, clear off floor, scrape fireproofing, erect platforms various locations on 2"'' floor, clear floor, cut ducts, demo walls, ceilings on 1®' floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2"^floor. One worker was present for the decon maintenance. I used B stairwell to proceed to the 3™ floor.

3'“ Floor - 42 workers were found on the floor in the process of: scraping fireproofing at the area 5, cleaning the platforms of the scaffold, sweeping floor, picking up debris, placing into the boxes; sealing the dock at the north side hallway, plasticizing the platform with poly. Workers at the south side vestibule were cutting metal and placing into the boxes, spraying with amended water, wrapping beams with poly, preparing and loading out boxes. 22 Gaylord boxes were ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2"“ floor.

2"*^ Floor - 58 workers were present. Workers on 5 scaffolds were scraping fireproofing at the area 5, spraying . with amended water, cleaning the floor, re-sealing the critical barriers and floor. Eagle scaffolding workers setting up the platforms across shaft. Workers were cutting metal using tools attached to the HEPA vacuum, wrapping beams with poly, preparing boxes. 65 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 35 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the V’ floor.

1“ Floor - 81 workers were present. Platinum Electricians were cutting conduit inside the electrical room. Workers on ladders were demolishing the brick wall, using hammer, spraying with amended water. Workers on scissor lifts at the various locations were cutting heating pipes; taking down hard concrete drop ceiling, clearing shafts, placing debris into the boxes and spraying with amended water, cutting metal at the various locations into the pieces, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 22 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the 3''‘floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Superv^^'s Initial

Borough I “Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131157

NYC-WTC_000182012

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182012Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →