NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 23, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 23, 2009, by TRC Environmental Corp.

NYC-WTC_000182024
Page image
Scanned page image, NYC-WTC_000182024
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/23/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Services, Inc. Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 (973) 772-3660 Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 (212) 221-7822 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj, Mqr/TRC Environmental 2:00 pm to 3:00 pm

I arrived at the premise at 2:00 pm. LVI schedule informed that activities include: scrape fireproofing, clear off floor on 3'‘'floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"^ floor, clear floor, cut ducts, demo walls, ceilings on 1 ” floor.

I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3'^loor. One worker was present for the decon maintenance, organizing the clean room. Negative air pressure on the floor was -0.040.

3'” Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams and columns at the area 12, picking up debris from the floor, placing into the boxes. Other workers were preparing and loading out boxes. 5 Gaylord boxes were ready to be taken out. 23 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2"'^ floor.

2"“ Floor - 54 workers were found inside the work area. Scraping of fireproofing at the area 12 was completed and workers on scaffolds were washing and cleaning the ceilings, beams, floor, equipment, washing the poly of the critical barriers; washing and demobilizing the scaffolds. Other workers were sweeping the floor using equipment equipped with HERA filters, preparing and loading out boxes. 10 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the V floor.

V' Floor - 67 workers were present on the floor. Workers inside the west shaft were sealing the critical barriers with 6 mil poly, preparing the area for air duct and pipe removal. Workers on scissor lifts at the west side vestibule were removing insulation and cutting air ducts; cutting and demolishing metal partition; clearing shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations I into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. Eagle scaffolding workers were erecting platform inside the mechanical room. A large amount of debris and poly wrapped beams still exists on the floor. 45 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 3'“’ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial _____ Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=PubIic Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131173

NYC-WTC_000182024

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182024Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →