NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/23/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental Services, Inc.
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 (973) 772-3660
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 (212) 221-7822 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj, Mqr/TRC Environmental 2:00 pm to 3:00 pm
I arrived at the premise at 2:00 pm. LVI schedule informed that activities include: scrape fireproofing, clear off
floor on 3'‘'floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"^ floor, clear floor,
cut ducts, demo walls, ceilings on 1 ” floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 3'^loor. One worker was present for the decon maintenance, organizing the clean
room. Negative air pressure on the floor was -0.040.
3'” Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams and
columns at the area 12, picking up debris from the floor, placing into the boxes. Other workers were preparing
and loading out boxes. 5 Gaylord boxes were ready to be taken out. 23 Micro trap machines were powered on
and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the 2"'^ floor.
2"“ Floor - 54 workers were found inside the work area. Scraping of fireproofing at the area 12 was completed
and workers on scaffolds were washing and cleaning the ceilings, beams, floor, equipment, washing the poly of
the critical barriers; washing and demobilizing the scaffolds. Other workers were sweeping the floor using
equipment equipped with HERA filters, preparing and loading out boxes.
10 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the V floor.
V' Floor - 67 workers were present on the floor. Workers inside the west shaft were sealing the critical barriers
with 6 mil poly, preparing the area for air duct and pipe removal. Workers on scissor lifts at the west side
vestibule were removing insulation and cutting air ducts; cutting and demolishing metal partition; clearing
shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations I
into the pieces, wrapping beams, preparing and loading out boxes through the waste decon. Eagle scaffolding
workers were erecting platform inside the mechanical room. A large amount of debris and poly wrapped beams
still exists on the floor. 45 Gaylord boxes were on the floor ready for load out. Inspection was done on micro
trap machines and tents.
I used B stairwell to proceed to the 3'“’ floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailers.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
_____
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=PubIic Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131173
NYC-WTC_000182024
OCR can misread numbers and units. Confirm readings against the page image before using them.