Asbestos inspection log, 130 Liberty Street, March 27, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 27, 2009, by TRC Environmental Corp.

NYC-WTC_000182027
Page image
Scanned page image, NYC-WTC_000182027
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/27/09 Floor ;Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze______ F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from; Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:00 am to 9:00 am

I arrived at the premise at 8:00 am. LVI schedule informed that activities include; scrape fireproofing, clear off floor on 3'''floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"" floor, clear floor, cut ducts, demo walls, ceilings on V floor. I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3™loor. One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0.034.

3'^ Floor - 34 workers were on the floor, scraping fireproofing at the areas 10 and 11, spraying fireproofing with amended water, washing and cleaning beams, columns, platforms of the scaffolds, picking up debris from the floor, placing into the boxes, cleaning the floor. One worker on ladder harnessed and attached to a life safety line was cutting metal pieces at the ceiling. Others were replacing filters and preparing boxes. 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the 2"" floor.

2"'^ Floor - 52 workers were present inside the work area. Fireproofing removal at the area 11 was completed and workers were encapsulating the clean areas 10 and Ilin the hallway between two shafts. Eagle scaffolding workers were erecting platforms at the high ceiling vestibule; two workers in scissor lift were demolishing the partition at the north side of the work area. Others were cleaning and plasticizing the floor and critical barriers, picking up gross debris, placing into the boxes. 3 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I used B stairwell to proceed to the l” floor.

1” Floor - 67 workers were on the floor. Workers in scissor lifts, wearing harnesses and attached to a life safety line, were removing insulation and cutting air duct at the east side hallway, metal fixtures from the ceiling at the various locations, cutting and demolishing metal and glass partition at the east side area; cutting conduit and clearing off south/west side shaft, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces. Inside mechanical room workers were observed faking apart ; conditioner; workers on mezzanine were demolishing metal frame and glass partition. Other workers were preparing boxes, repairing the exhaust duct of one of micro trap machines. A large amount of debris and poly wrapped beams exists on the floor. 12 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 3'“ floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailers.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough l=ManhalTan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Properly

CITY_DEP_WORBY_CANNATA_SUBP_000131189

NYC-WTC_000182027

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182027Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →