Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 03/25/09
Floor Zip Borough Block Lot Squad # Badge #
Various 1 n 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
state Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 2:00 pm to 3:10 pm
I arrived at the premise at 2:00 pm. LVI schedule informed that activities include: scrape fireproofing, clear off
floor on 3'''floor, clear off floor, scrape fireproofing, erect platforms various locations on 2"” floor, clear floor,
cut ducts, demo walls, ceilings on 1^' floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 3'''loor.One worker was present for the decon maintenance, cleaning and
organizing the clean room. Negative air pressure on the floor was -0.029.
3'''’ Floor - 34 workers were on the floor in the process of scraping fireproofing and washing beams and
columns at the areas 9 and 10, spraying with amended water, cleaning platforms of the scaffolds, picking up
debris from the floor, placing into the boxes. Workers at the south aide work area were re-sealing the escalator
shaft preparing above ceiling for fireproofing removal; others were preparing boxes.
3 sealed Gaylord boxes were on the floor. 20 Micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents.
I used B stairwell to proceed to the 2"'' floor.
2"” Floor - 45 workers were found inside the work area. Workers on scaffolds were washing and cleaning the
beams and columns, critical barriers, scaffolds, picking up gross debris from the floor. Inside the south/west
shaft workers were cutting pipes and filling up the holes with foam. At the high ceiling vestibule workers in
scissor lift were cutting metal fixtures from the ceiling. Other workers were: plasticizing the wall and floors inside
the shaft area at the various locations, sweeping up the floor using equipment equipped with HEPA filters,
preparing boxes.
3 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
I used B stairwell to proceed to the 1®' floor.
V* Floor - 68 workers were on the floor. Workers in scissor lifts, wearing harnesses and attached to a life
safely line, were cutting pipes, air ducts, metal fixtures from the ceiling at the various locations of the work area,
removing insulation, cutting and demolishing metal partition; cutting conduit and clearing off shafts, placing
debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces,
wrapping beams, preparing and loading out boxes through the waste decon. One worker was observed inside
the mechanical room cutting conduit on the floor and using electrical tool with HEPA vacuum attached. A large
amount of debris and poly wrapped beams exists on the floor. 45 Gaylord boxes were on the floor ready for
load out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 3"^ floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor. Inspection was done on ATC trailers.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
-----------
Borough l=Manhartan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4-=Projcct not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131167
NYC-WTC_000182022
OCR can misread numbers and units. Confirm readings against the page image before using them.