NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street i 03/25/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
state Zip Phone state Zip Phone
NY 10018 NY 1 S (212) 962-2300
Contact Person:Arnel Javal, Sr. Proj. Mgr/TRC Time of Inspection from:8:30 amto9:40am
I arrived at the premise at 8:30 am, LVI schedule informed that activities include: scrape fireproofing,
clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations
on 2™“ floor, clear floor, cut ducts, demo walls, ceilings on l” floor,
I proceeded to the decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on 3"’loor,
One worker was present for the decon maintenance, cleaning and organizing the clean room.
Negative air pressure on the floor was -0,028,
3"* Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams
and columns at the areas 9 and 10, cleaning platforms of the scaffolds, picking up debris from
the floor, placing into the boxes. Other workers were preparing boxes.
TRC, ATC, URS Inspectors were doing visual inspection at the areas 11 and 12, where
the fireproofing removal was completed,
3 sealed Gaylord boxes were on the floor, 20 Micro trap machines were powered on and
5 on stand by. Inspection was done on micro trap tents
I used 8 stairwell to proceed to the 2"'' floor.
2'"’ Floor-45 workers were found inside the work area Fireproofing removal at the areas 11 and 12
was completed and workers on scaffolds were washing and cleaning the beams and columns,
critical barriers, washing wall sealed with poly, scaffolds, sweeping up floor. Inside the south/west
shaft workers were cutting pipes and filling up the holes with foam. At the high ceiling vestibule
workers in scissor lift were cutting metal fixtures from the ceiling and brick wall. Other workers
were: plasticizing the wall and floors inside the shaft area at the various locations, sweeping up
the floor using equipment equipped with HERA filters, preparing boxes,
7 Gaylord boxes were on the floor sealed, sprayed and ready for load out.
22 micro trap machines were powered on and 5 on stand by.
Inspection was done on micro trap tents,
I used B stairwell to proceed to the Y floor.
V Floor - 68 workers were on the floor. One worker was observed inside the mechanical room
cutting conduit on the floor and using electrical tool with HEPA vacuum attached.
Eagle scaffolding workers were erecting platforms inside the west shaft and mechanical
room. Workers in scissor lifts, wearing harnesses and attached to a life safety line,
were cutting pipes, air ducts, metal fixtures from the ceiling at the various locations of the work
area, removing insulation, cutting and demolishing metal partition; cutting conduit and clearing
off shafts, placing debris into the boxes and spraying with amended water; cutting metal
at the various locations into the pieces, wrapping beams, replacing filters of micro trap
machines, preparing and loading out boxes through the waste decon, A large amount of debris
and poly wrapped beams exists on the floor,
15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap
machines and tents. While being for inspection on V floor Foremen told me that there was an
accident on the 3'“ floor, I used B stairwell to proceed to the 3'"' floor and met with Handler
Supervisor, who informed me that one of the workers felt from the ladder and hurt himself and
another worker: during the visual inspection worker was using a ladder to clean and re-tape critical
barrier on the ceiling at the shaft area. Worker was not wearing harness.
After following the decontamination procedure I signed the log book and used south hoist to return
to the offsite LVI, then TRC trailers to discuss the accident. Inspection was done on ATC trailers.
My observations were briefed to my Supervisor Ram Rammohan.
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough 1 - MunhattHn
J
2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code I = Violation Issued 2-No Violation Issued 3=No access 4=Project not started (no NOV)
S-Hublie Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131166
NYC-WTC_000182021
OCR can misread numbers and units. Confirm readings against the page image before using them.