NYC Law Department release
Independent mirror · updated as the City releases more · v1.3.2
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos inspection log, 130 Liberty Street, March 25, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 25, 2009, by TRC Environmental Corp.

NYC-WTC_000182021
Page image
Scanned page image, NYC-WTC_000182021
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street i 03/25/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York state Zip Phone state Zip Phone NY 10018 NY 1 S (212) 962-2300 Contact Person:Arnel Javal, Sr. Proj. Mgr/TRC Time of Inspection from:8:30 amto9:40am I arrived at the premise at 8:30 am, LVI schedule informed that activities include: scrape fireproofing, clear off floor on S'^floor, clear off floor, scrape fireproofing, erect platforms various locations on 2™“ floor, clear floor, cut ducts, demo walls, ceilings on l” floor, I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 3"’loor, One worker was present for the decon maintenance, cleaning and organizing the clean room. Negative air pressure on the floor was -0,028,

3"* Floor - I observed 36 workers on the floor in the process of scraping fireproofing and washing beams and columns at the areas 9 and 10, cleaning platforms of the scaffolds, picking up debris from the floor, placing into the boxes. Other workers were preparing boxes. TRC, ATC, URS Inspectors were doing visual inspection at the areas 11 and 12, where the fireproofing removal was completed, 3 sealed Gaylord boxes were on the floor, 20 Micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents I used 8 stairwell to proceed to the 2"'' floor.

2'"’ Floor-45 workers were found inside the work area Fireproofing removal at the areas 11 and 12 was completed and workers on scaffolds were washing and cleaning the beams and columns, critical barriers, washing wall sealed with poly, scaffolds, sweeping up floor. Inside the south/west shaft workers were cutting pipes and filling up the holes with foam. At the high ceiling vestibule workers in scissor lift were cutting metal fixtures from the ceiling and brick wall. Other workers were: plasticizing the wall and floors inside the shaft area at the various locations, sweeping up the floor using equipment equipped with HERA filters, preparing boxes, 7 Gaylord boxes were on the floor sealed, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents, I used B stairwell to proceed to the Y floor.

V Floor - 68 workers were on the floor. One worker was observed inside the mechanical room cutting conduit on the floor and using electrical tool with HEPA vacuum attached. Eagle scaffolding workers were erecting platforms inside the west shaft and mechanical room. Workers in scissor lifts, wearing harnesses and attached to a life safety line, were cutting pipes, air ducts, metal fixtures from the ceiling at the various locations of the work area, removing insulation, cutting and demolishing metal partition; cutting conduit and clearing off shafts, placing debris into the boxes and spraying with amended water; cutting metal at the various locations into the pieces, wrapping beams, replacing filters of micro trap machines, preparing and loading out boxes through the waste decon, A large amount of debris and poly wrapped beams exists on the floor, 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro trap machines and tents. While being for inspection on V floor Foremen told me that there was an accident on the 3'“ floor, I used B stairwell to proceed to the 3'"' floor and met with Handler Supervisor, who informed me that one of the workers felt from the ladder and hurt himself and another worker: during the visual inspection worker was using a ladder to clean and re-tape critical barrier on the ceiling at the shaft area. Worker was not wearing harness.

After following the decontamination procedure I signed the log book and used south hoist to return to the offsite LVI, then TRC trailers to discuss the accident. Inspection was done on ATC trailers. My observations were briefed to my Supervisor Ram Rammohan. NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough 1 - MunhattHn J 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code I = Violation Issued 2-No Violation Issued 3=No access 4=Project not started (no NOV) S-Hublie Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131166

NYC-WTC_000182021

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182021Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →