NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 05/19/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 1:50 pm to 2:40 pm
I arrived at the premise at 1:50 pm. LVI schedule informed that activities include: Stair B cleaning from scraping
Atrium area on 2"'' floor, clear floor, cut ducts, pipes, scrape fireproofing South East side, Eagle scaffolding -
erect platforms in various shafts, loading out boxes to ATC trailer on V floor.
I proceeded to the decon on 3^'’ floor, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area.
One worker was present for the decon maintenance.
I used the C stairwell to proceed to the 2"“’ floor.
2"'^ Floor - 18 Asbestos Handlers on scaffolds were scraping the fireproofing at the areas 9 and 10 - Atrium
Area, washing scaffolds and equipment, spraying the fireproofing with amended water, cleaning, sweeping the
floor using equipment equipped with HEPA filters, picking up debris and placing into the boxes.
Others were preparing and loading out boxes.
7 sealed Gaylord boxes were on the floor, sprayed and ready for load out. 22 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents.
I used the stairs to proceed to the 1 floor.
1” Floor - 64 workers were found in the process of: scraping the ceilings, beams and columns from
fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes.
Eagle scaffolding workers were erecting platforms inside the west2 and east shafts. At the north/east side area
workers on two scissor lifts were demolishing air duct and lifting down pieces of metal. Inside the former
computer room workers harnessed in scissor lifts were cutting and demolishing metal partition, cutting metal
fixtures from the beam, cutting piece of metal duct into the small pieces, spraying around the area with
amended water during cutting. Others were cutting metal into the pieces at the north/east side of work area,
wrapping beams with poly, preparing and loading out boxes through the north side waste decon. 20 Gaylord
boxes were ready for load out. Inspection was done on micro trap machines and tents.
I used the stairs to proceed to the 2"^ floor, then using C stairwell I preceded to the 3'“ floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial ,■
Borough 1-Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131103
NYC-WTC_000181985