Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 06/20/09
Floor Zip Borough Block Lot Squad # Badge #
Various_________ 1 row 1 54 1 1 A062
Inspector Building Type Basis Of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Third Party Air Monitor Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
state Zip Phone State Zip Phone
NY 10018 212-221-7822 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proi. Mgr/TRC Environmental 9:20 am to 10:10 am
I arrived at the premise at 9:20 am. LVI schedule informed that activities include: Exterior Faqade
removal on S'" and 4*'’ floors; fine clean floor, touch up after TRC/ATC visual on 3"'^ floor; fine clean
floor, touch up after TRC visual; clear floor, scrape fireproofing in shafts, box out debris, loading out
boxes to ATC trailer on 1floor; demo pipes & ducts, box out debris in basement.
North side hoist was under renovation therefore access to the 3"“ and 2"'' floors was closed.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area on V’floor.
Two workers were present for the decon maintenance, cleaning shower chamber and organizing
the clean room.
Negative air pressure on the floor was -0.039.
V Floor - 35 Asbestos Handlers were inside the work area. Workers on scaffolds were harnessed
scraping fireproofing at the west 2 and east side shafts. I observed that workers at the west 2 side
shafts were removing dry fireproofing without spraying with amended water. Foreman on the
floor Louis was advised that all surfaces shell be wetted while work is being conducted, and
spraying of fireproofing was conducted.
Other workers were picking up debris, placing into the boxes using metal shovels, cleaning the floor
from debris, preparing boxes, replacing filters. 38 Gaylord boxes were on the floor ready for load
out. 40 micro trap machines were on and 5 on stand by. Inspection was done on micro trap tents.
Using entrance from V* floor I proceeded to the basement.
Basement - 22 workers were on site. Two workers were on platform caring down the pieces of
metal that was cut at the upper west side ceiling. At the north side of the work area workers were on
scaffolds cutting ducts using power tools attached to the HEPA vacuum; Others were spraying the
area with amended water, placing debris into the boxes, picking up debris from the floor,
preparing boxes. 10 Gaylord boxes were on the floor ready to be taken out. Inspection was done on
micro trap machines and tents.
Using exit I went back to the 1” floor.
After following the decontamination procedure I exited the work area.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor's Initial
_________
Borough l=Maiiliattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stones B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4-Project not started (no NOV)
5=Public Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131042