NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 02/04/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
State Zip Phone Sample Number
Laboratory Name Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 8:45 pm to 9:45 pm
I arrived at the premise at 8:45 pm. LVI schedule informed that activities include demo ducts,
cut metal on 3™ and 2"‘' floors, clear off floor for demo on T* floor.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area on 1’* floor. Negative air pressure on the floor was 0.023,
Three workers were present for the decon maintenance, cleaning the clean room. I saw one individual
inside the shower room in his street clothe on, coming out from the work site and going to the clean room.
Using B stairwell I proceeded to the 3"’floor.
3"* Floor - 16 workers were working on the floor. Workers on scaffolds cutting and removing air duct at the
west side of the work area, cutting, placing into the boxes and spraying with amended water.
Other workers were inspecting and resealing the critical barrier at the north side decon, wrapping debris
with poly, replacing the filters of micro trap machines. 8 Gaylord boxes were still on the floor ready for
load out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 2"'' floor.
2’’“' Floor - 16 workers were found inside the work place. Workers on scaffolds at the south side of the area
were removing metal fixtures from the ceiling, cutting and removing air ducts on the south/east side of the
floor, cutting and removing pipes from the ceiling at the door of the A stairwell, using scissor lifts. Other
workers were picking up debris from the floor, placing into the boxes and spraying with amended water,
wrapping beams with poly, preparing boxes. 20 Gaylord boxes and a large amount of poly wrapped beams
were ready to be taken out. Inspection was done on micro trap machines and tents.
I used B stairwell to proceed to the 1®’ floor.
1” Floor - 19 workers were clearing off the floor. A large amount of debris still exists on the floor.
Workers at the shaft areas working to clear the shafts from debris at the different locations on the floor,
placing debris into the boxes, spraying boxes and work areas with amended water, preparing, wrapping
and loading out boxes through the waste decon, preparing the work area for demolition. 24 sealed Gaylord
boxes were on the floor. Inspection was done on micro trap machines and tents.
After following the decontamination procedure I signed the log book and left the remote decon,
located on the ground floor.
Inspection was done on ATC trailer.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >5 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV)
5=Pub!ic Owned Property
CITY_DEP_WORBY_CANNATA_SUBP_000131212
NYC-WTC_000182041
OCR can misread numbers and units. Confirm readings against the page image before using them.