NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date;
130 Liberty Street 05/18/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze_____ F TRU2068MN08 yes
Contractor's Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Laboratory Name Owner's Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 NY 10006 (212) 962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 13:10 pm to 15:15 pm
larrivedSthepremiseatiyiOprrnZvrscheduiekrformeTthatacUvftiesinciude?StairBcieaningfi^^
11"’ floor, scraping Atrium area on 2"" floor, clear floor, cut ducts, pipes, scrape fireproofing South East side.
Eagle scaffolding - erect platforms in various shafts, loading out boxes to ATC trailer on V floor.
I proceeded to the decon on 6*’ floor, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area B stairwell.
One worker was present for the decon maintenance. I used the stairs to proceed to the 9'^, 10'" and 11'" floors.
9’" , 10*", 11’" Floors - 14 Workers were found at the B stairwell in the process of sealing pipes with plastic,
taping the edges and critical barriers with duct tape, using ladders, fine cleaning and wet wiping the walls and
stairs using mops, fabrics, brushes, rags, sponges, using water and Betco solution to remove the mold.
Using stairs I went back to the 6'" floor decon. I observed that there was no hot water in the shower room. LVI
Supervisor was informed and advised to take corrective actions.
After decontamination procedure I left the decon and used south hoist to proceed to the 3'" floor.
I proceeded to the decon on 3"* floor, signed the log book, don the appropriate level of personal protective
equipment to enter the regulated area.
One worker was present for the decon maintenance. I used the stairs to proceed to the 2"" floor.
2"" Floor - 18 Asbestos Handlers on scaffolds were still scraping the fireproofing at the area 9 - Atrium Area,
washing scaffolds and equipment, spraying the fireproofing with amended water. Workers on the floor were
sweeping the floor using equipment equipped with HERA filters, cleaning the floor from fireproofing, placing
debris into the boxes; plasticizing the area 10, preparing for fireproofing removal. Two workers and foreman
were breaking the brick wall of the shaft near the stairwell A to empty the shaft, full of debris.
Others were replacing the filters of micro trap machines, preparing and loading out boxes.
17 sealed Gaylord boxes were on the floor, sprayed and ready for load out. 22 micro trap machines were
powered on and 5 on stand by. Inspection was done on micro trap tents. I observed excess water on the floor
near south side decon. Foreman was advised, and one worker picked up the water using wet-dry HEPA
vacuum. I used the stairs to proceed to the T*' floor.
1” Floor - 64 workers were found in the process of: scraping the ceilings, beams and columns from
fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes.
Eagle scaffolding workers were erecting platforms inside the north/west shaft. Al the north/east side area
workers on two scissor lifts were clearing the air duct from debris, spraying with amended water, demolishing
and lifting down the pieces of air duct. Others were cutting metal at the north/east, wrapping beams with poly,
preparing and loading out boxes through the waste decon. 25 Gaylord boxes were ready for load out.
Inspection was done on micro trap machines and tents.
I observed that exhaust duct of the micro trap machine near the tent B-1 was cut off. Supervisor Louis
Rodriguez was advised to conduct emergency repair. Exhaust duct was repaired immediately.
I used the stairs to proceed to the 3’" floor.
After following the decontamination procedure I signed the log book and used south hoist to return to the
ground floor. Inspection was done on ATC trailer.
I met Javal Arnel Senior Project Manager of TRC at the offsite TRC trailer to discuss the findings of the
inspection.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough 1-Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3-No access 4=Project not started (no NOV)
5=Public Owned Property
C ITY_D EP_WO RBY_C AN NAT A SU B POO0131105
NYC-WTC_000181987