NYC 9/11 Public Portal Document
Asbestos Inspection Report
Premise No. Inspection Date:
130 Liberty Street 06/19/09
Floor Zip Borough Block Lot Squad # Badge #
Various 10006 1 54 1 1 A062
Inspector Building Type Basis of Inspection Photos Taken
M.Gagnidze F TRU2068MN08 yes
Contractor’s Name Sample Number
LVI Environmental
Address City Sample Number
462 Getty Avenue Clifton
State Zip Phone Sample Number
NJ 07011 973-772-3660
Third Party Air Monitor Owner’s Name
TRC Environmental Corp The Lower Manhattan Development Corp.
Address City Address City
1340 Broadway New York One Liberty Plaza New York
State Zip Phone State Zip Phone
NY 10018 212-221-7822 NY 10006 (212)962-2300
Contact Person Time of Inspection from:
Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:00 am to 10:20 am
I arrived at the premise at 9:00 am. LVI schedule informed that activities include: Exterior Facade removal on
5'” and 4'’’ floors; fine clean floor, touch up after TRC/ATC visual on 3'“ floor; fine clean floor, touch up after
TRC visual; clear floor, scrape fireproofing in shafts, box out debris, loading out boxes to ATC trailer on 1’* floor;
demo pipes & ducts, box out debris in basement.
I proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to
enter the regulated area on 2"'' floor. One worker was present for the decon maintenance organizing the clean
room. Negative air pressure on the floor was -0.036.
Using “C” stairwell I proceeded to the 3"* floor.
3"'' Floor - 6 Asbestos Handlers were present on the floor, fine cleaning two columns at the east side work
area using scaffolds, cleaning and plasticizing the edges and floor using equipment with HEPA fillers. I
observed that workers were cleaning and drying the platforms of the shaft area from water that was dripping
from the 4®' floor. 1 Gaylord box was sealed and ready to be taken out. Inspection was done on micro trap
machines and tents.
I used “C” stairwell to access 2"" floor.
2'”' Floor - 22 workers were found at the work area, fine cleaning the floor using HEPA vacuum. Workers on
scaffolds were cleaning columns at the north/east side area, covering holes on the floor with plastic. 5 Gaylord
boxes were ready for load out. Inspection was done on micro trap machines and tents.
After following the decontamination procedure I used north hoist to return to the ground floor.
I proceeded to the west side remote decon, signed the log book, don the appropriate level of personal
protective equipment to enter the regulated area on 1“ floor.
1®' Floor - 46 Asbestos Handlers were inside the work area. Workers al the east side area were picking up
excess water from the floor; replacing the filters of micro trap machines at the north/east side area; workers on
scaffolds were harnessed scraping fireproofing at the north/west vestibule, west and west 2 side shafts; cutting
air duct at the west side shaft. Other workers were picking up debris, placing into the boxes using metal
shovels, cleaning the floor from debris, preparing boxes. 60 Gaylord boxes were on the floor ready for load out.
40 micro trap machines were on and 5 on stand by. Inspection was done on micro trap tents.
Using the entrance from 1®* floor I proceeded to the basement.
Basement - 18 workers were working on site. Two handlers were observed on the upper west side platform
cutting air ducts using tools with HEPA vacuum attached, spraying the area with water. At the north side of the
work area workers on scaffolds were cutting air ducts and conduits using power tools attached to the HEPA
vacuum; others were spraying the area with amended water, picking up debris from the floor, wrapping with
poly, preparing boxes. 15 Gaylord boxes were on the floor ready for load out. Inspection was done on micro
trap machines and tents.
Using exit I went back to the 1®' floor.
After following the decontamination procedure I exited the work area.
NOV# Infraction Infraction Infraction Infraction
NOV# Infraction Infraction Infraction Result Code
2
NOV# Infraction Infraction Infraction Supervisor’s Initial
Borough l=Manhattan 2=Bronx 3=Brooklyn l=0ueens 5=Richinond
Building Type A >6 stories B <6 stories C single family D school E hospital F public owned
Result Code 1 = Violation Issued 2=No Violation Issued 3=No acc fSS 4=Project not started (no NOV)
5=Pub]ic Owned Property
CITY_DEP__WORBY_CANNATA_SUBP_000131022
NYC-WTC_000181945
OCR can misread numbers and units. Confirm readings against the page image before using them.