Asbestos inspection log, 130 Liberty Street, May 18, 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on May 18, 2009, by LVI Environmental Services Inc.

NYC-WTC_000181987
Page image
Scanned page image, NYC-WTC_000181987
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date; 130 Liberty Street 05/18/09 Floor Zip Borough Block Lot Squad # Badge # Various 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze_____ F TRU2068MN08 yes Contractor's Name Sample Number LVI Environmental Address City Sample Number 462 Getty Avenue Clifton State Zip Phone Sample Number NJ 07011 973-772-3660 Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 10006 (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 13:10 pm to 15:15 pm larrivedSthepremiseatiyiOprrnZvrscheduiekrformeTthatacUvftiesinciude?StairBcieaningfi^^ 11"’ floor, scraping Atrium area on 2"" floor, clear floor, cut ducts, pipes, scrape fireproofing South East side. Eagle scaffolding - erect platforms in various shafts, loading out boxes to ATC trailer on V floor. I proceeded to the decon on 6*’ floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area B stairwell. One worker was present for the decon maintenance. I used the stairs to proceed to the 9'^, 10'" and 11'" floors. 9’" , 10*", 11’" Floors - 14 Workers were found at the B stairwell in the process of sealing pipes with plastic, taping the edges and critical barriers with duct tape, using ladders, fine cleaning and wet wiping the walls and stairs using mops, fabrics, brushes, rags, sponges, using water and Betco solution to remove the mold. Using stairs I went back to the 6'" floor decon. I observed that there was no hot water in the shower room. LVI Supervisor was informed and advised to take corrective actions. After decontamination procedure I left the decon and used south hoist to proceed to the 3'" floor. I proceeded to the decon on 3"* floor, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area. One worker was present for the decon maintenance. I used the stairs to proceed to the 2"" floor. 2"" Floor - 18 Asbestos Handlers on scaffolds were still scraping the fireproofing at the area 9 - Atrium Area, washing scaffolds and equipment, spraying the fireproofing with amended water. Workers on the floor were sweeping the floor using equipment equipped with HERA filters, cleaning the floor from fireproofing, placing debris into the boxes; plasticizing the area 10, preparing for fireproofing removal. Two workers and foreman were breaking the brick wall of the shaft near the stairwell A to empty the shaft, full of debris. Others were replacing the filters of micro trap machines, preparing and loading out boxes. 17 sealed Gaylord boxes were on the floor, sprayed and ready for load out. 22 micro trap machines were powered on and 5 on stand by. Inspection was done on micro trap tents. I observed excess water on the floor near south side decon. Foreman was advised, and one worker picked up the water using wet-dry HEPA vacuum. I used the stairs to proceed to the T*' floor. 1” Floor - 64 workers were found in the process of: scraping the ceilings, beams and columns from fireproofing at the area 1 - south side, cleaning the floor from debris, placing into the boxes. Eagle scaffolding workers were erecting platforms inside the north/west shaft. Al the north/east side area workers on two scissor lifts were clearing the air duct from debris, spraying with amended water, demolishing and lifting down the pieces of air duct. Others were cutting metal at the north/east, wrapping beams with poly, preparing and loading out boxes through the waste decon. 25 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I observed that exhaust duct of the micro trap machine near the tent B-1 was cut off. Supervisor Louis Rodriguez was advised to conduct emergency repair. Exhaust duct was repaired immediately. I used the stairs to proceed to the 3’" floor. After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer. I met Javal Arnel Senior Project Manager of TRC at the offsite TRC trailer to discuss the findings of the inspection.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s Initial

Borough 1-Manhattan 2=Bronx 3=Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family D school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3-No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131105

NYC-WTC_000181987

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000181987Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →