Asbestos inspection log, 130 Liberty Street, March 2009

Machine-extracted title · confidence 95%

Record of an asbestos inspection conducted at 130 Liberty Street on March 2, 2009 by TRC Environmental Corp.

NYC-WTC_000182010
Page image
Scanned page image, NYC-WTC_000182010
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Asbestos Inspection Report

Premise No. Inspection Date: 130 Liberty Street 03/02/09 Floor Zip Borough Block Lot Squad # Badge # Various_________ 10006 1 54 1 1 A062 Inspector Building Type Basis of Inspection Photos Taken M.Gagnidze F TRU2068MN08 yes Contractor’s Name Sample Number LVI Environmental Address City Sample Number

State Zip Phone Sample Number

Laboratory Name Owner's Name TRC Environmental Corp The Lower Manhattan Development Corp. Address City Address City 1340 Broadway New York One Liberty Plaza New York State Zip Phone State Zip Phone NY 10018 NY 1 b (212) 962-2300 Contact Person Time of Inspection from: Arnel Javal, Sr. Proj. Mgr/TRC Environmental 9:05 am to 10:25 am

I arrived at the premise at 9:05 am, proceeded to the decon, signed the log book, don the appropriate level of personal protective equipment to enter the regulated area on 2"‘’floor. One person was present for the decon maintenance, cleaning the shower chamber. I used B stairwell to proceed to the 3"* floor.

3'“ Floor - 33 workers were present on the floor, cutting metal fixtures from the ceiling, spraying around the area with amended water. Carpenters working with plywood, building the platforms across shafts. Electricians setting up electrical room, plasticizing inside with 6 mil poly, wrapping the cables. Workers on scissor lifts at the south extended area were removing insulation and taking down air ducts; cutting metal fixtures.at the south side decon, were cutting air duct to remove and cut into the pieces. 4 Gaylord boxes were ready for load out. Inspection was done on micro trap machines and tents. I used B stairwell to proceed to the 2'"’ floor.

2"“ Floor - 33 workers were found inside the work place, cutting and removing black metal panels from the columns at the east side work area. Workers on scissor lifts at the south/east side vestibule were cutting metal fixtures from the ceiling. Electricians inside the electrical room were cutting dead pipes and plasticizing the room with poly. Workers demolishing the brick wall at the south/east side, spraying around the area with amended water, picking up debris, placing into the black asbestos bags; cutting metal using tools attached to the HEPA vacuum, others spraying the area with amended water, wrapping beams with poly, preparing boxes. 3 Gaylord boxes were on the floor sealed, sprayed and ready for load out. I used B stairwell to proceed to the V floor.

1“ Floor - 42 workers on the floor. Electricians were working with the wires at the electrical panel. Workers ion scissor lifts were removing and drop ceiling, spraying with amended water; clearing the shafts from debris, placing into the boxes and spraying with water, cutting metal at the various locations, preparing, wrapping and loading out boxes through the waste decon. A large amount of debris and poly wrapped beams exists on the floor. 8 Gaylord boxes were on the floor ready to be taken out. Inspection was done on micro trap machines and tents. I used B stairwell to go back to the S'^floor.

After following the decontamination procedure I signed the log book and used south hoist to return to the ground floor. Inspection was done on ATC trailer.

NOV# Infraction Infraction Infraction Infraction

NOV# Infraction Infraction Infraction Result Code 2 NOV# Infraction Infraction Infraction Supervisor’s^tial

Borough I-Manhattan 2-Bronx 3-Brooklyn 4=Queens 5=Richmond Building Type A >6 stories B <6 stories C single family L) school E hospital F public owned Result Code 1 = Violation Issued 2=No Violation Issued 3=No access 4=Project not started (no NOV) 5=Public Owned Property

C ITY_D EP_WO RBY_C AN NAT A SU B POO0131155

NYC-WTC_000182010

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000182010Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →