NYC 9/11 Public Portal Document
NOU 17'’98 16=03 PR flMBflSSPDOR CONSTR. C0212 949 9762 TO 6694107 P.07/36
AMBASSADOR CONSTRUCTION CO, INC.
Mr. Walter Weems
October 15,1998
PageTwo...
7) Per drawing E4-02 dated 9/25/98;
A. Add one (1) 200amp 3 pole and one (1) 70amp 3 pole breaker in EDPL-23E.
t . B. Delete one (1) 3 pole lOOamp breaker in EDPL'23E.
'^'^—7^ C. Revise panel ULP-23W and ULP-R from 3 phase 4 wire to 1 phase three wire.
D. Add one (1) 50amp 2 pole breaker in panel ELP-23C1.
E. Delete two (2) 15amp 1 pole breakers in panel ELP-23C1.
All panels have been delivered and installed with the branch circuitry and feeders. Panel
EDPL23-E will have to be replaced in its entirety. All branch and feeder wiring will be removed
and then re-installed. Panel ULP23W & R will also have to be replaced. New panels will be
provided and,re-installed. New breakers will be installed for panel EJ_P-23C-1. , ,,
_______ b'^. 3 PJc h Z.3C__________________
O') 3 AM "70A
3 if’.lf Cyg '-f aa/_-2-
. A// I C>in I 3 f^U
______________ A-J/ I svA I
X S' zc
Martin Schneider
Vice President
cc; Juan Mejia - SHC
Glenn Pymento - DCAS
Accepted:_____________ Dated:
CAMP\MMaottA»ooc£\o6u\e£uceie ^^*0
S£®W
/^iu fcn£- ■
212 949 9762 97>; P.07‘