PPS-Generators
Upon the master PLC failing or loss of the master DC power bus, the
loa(^add/shed circuitry of the PLC becomes inoperative. Simultaneously,
the Manual Override panel is enabled. The operator can manually
add/shed loads through the activation toggle switches. These switches are
individually wired in parallel with the PLC add/shed outputs. During this
condition, the operator must observe the generator kW meters to ensure
the generators are not overloaded. In the event that an overload condition
does occur, all manually transferred ATS' will be shed from the bus.
The operator would then deactivate the appropriate toggle switches to
reduce the load. A manual reset button located on the override panel
would have to be depressed to restore the manual override circuit.
An on-line UPS shall be provided as an alternate power source to back-up
the system logic for the PLC. This UPS shall be constantly on-line when
the engine generators are available. The on line UPS shall be sized to
handle the PLC provided.
0. Master control cubicle shall be capable of mounting and wiring a remote
I/O devices supplied by building management system. I/O device shall be
capable of receiving an analog signal from the master PLC to represent
total generator output KW available. Signal shall be 4-20mA and scale
shall be shown on switchgear controls MFG interface dwg. Signal shall
be used by BMS to evaluate if additional mechanical loads can be added
to the generators. At least 5 digital signals shall be available for status
indication to BMS for shedding or previously added loads due to
generator failure or bus overload, or as a permissive to allow BMS load
add.
I/O device should also be capable of receiving digital signals for all pre
alarms and shutdowns for each generator as well as all status points in
master control section. These points are defined in other parts of this
spec section.
7, Each generator cubicle shall incorporate
a. Generator Circuit Breaker
A low voltage circuit breaker shall be furnished to provide overcurrent
protection and paralleling functions. The breaker shall be as sized on
drawings, 3 pole, electrically operated, drawout, with solid state trip
elements. Trip elements shall include adjustable long delay, short delay,
ground fault alarm only and instantaneous settings. Breakers shall have 5
cycle stored energy closing. Drawout feature shall provide for connected
test and disconnected positions. In the connected position the main line
OEM PPS-36 Generators
7 WTC March 20, 1998
NYC-WTC_000166911