NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166912
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

and load terminals and all auxiliary control contacts and circuitry only shall^ connected to permit automatic operations of the complete control system without actually connecting the generator to the main bus. In the disconnect position, main and auxiliary control contacts and circuitry shall be completely disconnected. The breaker drawout mechanism shall be mechanically interlocked with the breaker to permit drawout operation only when the breaker main contacts are open.

b. Generator Sensing Control

Control sensing panel shall be furnished to protect, monitor, and control the operation of each generator set.

Each generator sensing panel shall include the following components, devices, and indicators;

1) Reverse Power Proctective Relay (Device 32)

An adjusuble reverse power solid state relay shall be provided to detect a motorizing condition of the respective engine generator set. The trip setting shall be adjustable from 0 to 15 % of the forward power rating of the respective engine generator set. Response shall be independent of frequency over a range of 40 to 70 Hz. The relay shall include a test switch to enable the relay circuit to sense forward power for periodic testing and adjustment. The relay shall include a solid state linear time delay to insure compatibility with engine driven generator set characteristics. The time delay shall have a range of adjustability of 0.1 to 60 seconds and be factory set at 2.0 seconds. The relay shall respond to power, the inphase component of current, across a power factor range of 0.2 to unity, leading or lagging, with a repeatability within plus or minus 3.0%. Do not substitute relays with inverse time characteristics.

2) Generator Voltage Protective Relay (Device 27)

An undervoltage solid state relay shall be included to respond to the true r.m.s. value of the generator voltage. This relay shall have an adjustable pick up range of 75 % to 100% nominal and an adjustable dropout of 80% of pickup. Dropout shall have zero differential for time delay reset.

OEM PPS-37 Generators 7 WTC March 20, 1998

NYC-WTC_000166912

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166912Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →