NYC Law Department release
Independent mirror · updated as the City releases more · v1.2.6
← Document results/7DCAS/GENERATOR PREPURCHASE SPECIFICATION
Document / 52 pages

Transmittal of generator prepurchase specifications, March 1998

Machine-extracted title · confidence 90%

Cover sheet transmitting requested prepurchase specifications for generators to the Department of Citywide Administrative Services.

NYC-WTC_000166874–000166925

Folder label: “GENERATOR PREPURCHASE SPECIFICATION

Page image
Scanned page image, NYC-WTC_000166902
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PPS-Generators

Provide form C (n/o-n/c) dry contacts for each of the above pre-alarms and shutdowns for interface with the BMS system. Bring wiring out to a set of terminals dedicated for this interface for the BMS contractor to extend from.

The indications shall be of the manual reset type. An alarm silencing switch and "alarm silenced" pilot light shall be included.

8. Controls shall be included in the switchgear for the tripping and lock-out of the circuit breaker for each generator set in response to reverse power, over-current or the failure to parallel.

9. Controls shall be included in the switchgear for the automatic disconnection of generators from the switchgear bus in a pre-determined field adjustable sequence as load falls, and the restoration of generators to the bus as it increases.

10. Controls shall be included in the switchgear for the simultaneous automatic disconnection of all generators from the switchgear bus in response to the activation of contacts indicating that all outlying automatic transfer switches have retransferred to the "normal position".

11. Provisions shall be included in the switchgear for the field installation and wiring of ground fault sensors, relays and monitor panels described elsewhere as part of the ground fault interrupting system.

12. Controls shall be included in the switchgear to shut down each generator set after an adjustable time delay period of five to twenty-five minutes following its discon­ nection from the switchgear bus.

13. Provisions shall be included in the switchgear for the manual starting, synchronizing and shutdown of each generator set, as well as the manual operation of each generator circuit breaker and outgoing feeder circuit breaker.

14. Provisions shall be included in the switchgear for the testing of the automatic starting and synchronizing sequence under "no load" conditions.

15. An audible signal and a visual indication shall be provided at the switchgear for the following "system pre-alarm" and "system actual alarm" conditions:-

a. Low fuel in main tank — pre-alarm.

b. Over/Under voltage — pre-alarm.

c. Over frequency — pre-alarm.

OEM PPS-27 Generators 7 WTC March 20, 1998

NYC-WTC_000166902

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000166902Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Electrical proposal, ADCO Electrical Corp., May 1998 · Box 7DCAS

NYC-WTC_000172686

Revised electrical work proposal from ADCO Electrical Corporation for the Mayor's Office of Emergency Management on the 26th floor at 7 World Trade Center in May 1998.

2 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.881

machine-extracted · confidence unavailable · Check page ↗
HVAC specification supplement, unknown date · Box 7DCAS

NYC-WTC_000173223

Supplement to HVAC specifications detailing discharge plenum construction standards for emergency generators at the Mayor's Office of Emergency Management.

1 shared non-person entities · 1 shared topics · Same agency, volume and box · similarity 0.879

machine-extracted · confidence unavailable · Check page ↗

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →